My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/1/1982
CBCC
>
Meetings
>
1980's
>
1982
>
12/1/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:40 AM
Creation date
6/11/2015 2:37:27 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/01/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF VERO BEACH <br />EXHIBIT A <br />GOVERNMENTAL STREET LIGHTING RATE SCHEDULE <br />AVATI ARI 1: - <br />In all territory served. <br />APPLICATION: <br />For lighting of public ways and areas upon properly executed agreement <br />between County, City or other Governmental Agencies for ten (10) or more <br />luminaires. <br />TYPE OF INSTALLATION: <br />City owned fixtures normally will be mounted on poles of the City's existing <br />distribution system and served from overhead wires. On request of the Customer, <br />the City will provide special poles or underground wires at the charges specified <br />below. <br />SERVICE: <br />Service includes lamp renewals, patrol, energy from dusk each day until dawn <br />the following day, and maintenance of City owned street lighting systems. <br />LIMITATION OF SERVICE: <br />If the City is required to remove or replace existing luminaires under this <br />schedule, forcing premature retirement, the Customer shall be required to pay the <br />City an amount equal to the original installed cost, less any salvage value, <br />depreciated, based on applicable depreciation rates, plus the cost of removal. <br />Standby or resale service is not permitted hereunder. <br />MONTHLY RATE: <br />Luminaire <br />Lamp <br />Size <br />KWH/MO <br />Charge <br />for Unit <br />($) <br />Type <br />Lumens/Watts <br />Estimate <br />Facilities <br />Maintenance <br />Energy <br />Total <br />High Pressure <br />Sodium Vapor <br />5800 <br />70 <br />30 <br />3.21 <br />1.44 <br />2.10 <br />6.75 <br />" <br />9500 <br />100 <br />42 <br />3.21 <br />1.49 <br />2.94 <br />7.64 <br />" <br />16000 <br />150 <br />62 <br />3.28 <br />1.55 <br />4.34 <br />9.17 <br />" <br />27500 <br />250 <br />108 <br />4.38 <br />1.64 <br />7.56 <br />13.58 <br />Mercury Vapor <br />7000 <br />175 <br />79. <br />2,11 <br />1.01 <br />5..5.3 <br />8.,65. <br />" <br />11000 <br />250 <br />107 <br />3.28 <br />1.35. <br />-7.49 <br />12,12 <br />" <br />20500 <br />400 <br />164 <br />3.28 <br />1.33 <br />11.48 <br />16.09 <br />On Customer owned and maintained street lighting systems the monthly rate for <br />energy shall be 7.0� per KWH of estimated usage of each unit plus adjustments. <br />D E C 11982, ;1C FA -11E <br />
The URL can be used to link to this page
Your browser does not support the video tag.