Laserfiche WebLink
A <br />The Honorable Chairman And Members <br />of the Indian River City. Commission <br />T. R. Na son <br />Building fees <br />JECT <br />DEPT. <br />pt;fE November 24, 1982 <br />Finance ;director <br />DEPT _ <br />As requested during previous sessions, Mrs. Rymer and myself have <br />reviewed the entire revenue and expenses associated with the <br />City -County Building Department. The results of this <br />investigation have culminated in a revision to the attached <br />resolution outlining fees recommended for county building <br />projects. This resolution is followed by an analysis of building <br />department expenses of operation and revenue sources associated <br />with the inconne from county sources. <br />The anal psis was made based upon the actual•fees collected from <br />construction within the county area during fiscal year 1982. <br />These fees were converted from the old fee schedule of the county <br />to the schedule used by the City of Vero Beach and the Southern <br />Standard Building Congress. Based upon the actual fee income for <br />the county during this period the plans examining fee would have <br />brought in $67,328. The revenue from the plumbing, electrical-, <br />insulation and air conditioning permits would have brought in <br />$90,109. if charged on the city fee schedule. The balance of <br />funds necessary to meet the obligations of this department were <br />based upon -the building permit fee that is used by the city when <br />measured against the county sales. This revenue based upon 1982 <br />data would have brought in $142,852. worth of revenue. Inasmuch <br />as the balance needed from new construction ,fees was $107,743. <br />this resulted in a ratio of .75 or 75% of the total fee required. <br />It should be noted that this determination has been based upon an <br />already curtailed department that has 2 members less and is <br />based upon sales of the previous year. Therefore any changes in <br />these estimating parameters can have a positive or negative <br />effect on the amount of people required and the amount of revenue <br />obtained. In my opinion the fee schedule presented represents the <br />absolute minimum that must be derived from county sources in order <br />to keep the Building and Zoning Department operating at a break <br />even point and yet provide $25,000 income in transfers to the <br />county. <br />It should be.noted that the operating expenses of the department <br />totaled $389,005. This amount was adjusted for the transfers to <br />Indian River County and the City transfer of funds into the <br />department. Through this method we can determine the shared <br />expenses which are outlined in the attached analysis. <br />I respectfully request the commission consider this matter at its <br />next meeting. <br />110 61MK :z P'cI C of <br />DEC 15 19'0102 <br />