My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-009
CBCC
>
Ordinances
>
2010's
>
2011
>
2011-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 3:11:02 PM
Creation date
10/5/2015 9:12:21 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2011-009
Adopted Date
11/08/2011
Agenda Item Number
10.A.1.
Ordinance Type
Capital Improvements Element Program
State Filed Date
11\17\2011
Entity Name
Text Amendments
Subject
Capital Improvements Program 5 Year Schedule
Supplemental fields
SmeadsoftID
10379
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />➢ Libraries (Countywide) <br />• 580 building square feet per 1,000 permanent plus weighted peak seasonal population <br />• 3,200 library material items per 1,000 permanent plus weighted peak seasonal population <br />• 0.7 computers per 1,000 permanent plus weighted peak seasonal population <br />• 0.2 other library equipment items per 1,000 permanent plus weighted peak seasonal <br />population <br />➢ Potable Water (County Service Area) <br />• 250 gallons per day per equivalent residential unit <br />➢ Public Buildings (Countywide) <br />• 1.99 building square feet per capita for permanent plus weighted peak seasonal population <br />➢ Parks/Recreation (Unincorporated County) <br />• 6.61 acres per 1,000 permanent plus weighted peak seasonal population <br />➢ Sanitary Sewer (County Service Area) <br />• 250 gallons per day per equivalent residential unit <br />➢ Schools (School Service Area): <br />• 100 percent of Florida Inventory of School Houses (FISH) capacity for each public school <br />type (elementary, middle, and high). <br />➢ Solid Waste (Countywide) <br />• 2.2 tons per capita per year or 3.67 cubic yards per capita for permanent plus weighted <br />peak seasonal population per year <br />➢ Stormwater Management <br />• New drainage systems shall mitigate the impacts of a 25 year/24 hour design rainfall <br />event <br />• Minimum road crown elevation for existing roads shall be raised during <br />resurfacing/rebuilding to the flood elevation resulting from the 2 year/24 hour storm <br />event on local roads <br />• The center two lanes of rebuilt roads must be at or above flood levels resulting from a <br />10 year/24 hour storm event on Arterial and Collector roads <br />• All drainage basins will meet the following level -of -service standards: <br />• By 2000 - 2 year/24 hour storm event <br />• By 2005 - 5 year/24 hour storm event <br />• By 2010 - 10 year/24 hour storm event <br />➢ Transportation (Roadways) <br />Community Development Department <br />Adopted November _, 2011, Ordinance 2011 - <br />Indian River County <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.