Laserfiche WebLink
ORDINANCE 2012-036 <br />recorded in the Office of the Clerk of the Court in such a manner that it appears in the <br />chain of title of the affected parcel of land; and <br />(d) If the request is for a variance to allow construction of the lowest floor of a new <br />building, or substantial improvement of a building, below the required elevation a <br />copy in the record of a written notice from the Floodplain Administrator to the <br />applicant for the variance, specifying the difference between the base flood elevation <br />and the proposed elevation of the lowest floor, stating that the cost of federal flood <br />insurance will be commensurate with the increased risk resulting from the reduced <br />floor elevation (up to amounts as high as $25 for $100 of insurance coverage), and <br />statim that construction below the base flood elevation increases risks to life and <br />property. <br />2. Dhysiea4 hardships pei4 Haiffig t$t1 6phy, soils, geology, 0 <br />1. Submittal of deeum2i#Mie � the state hist pie <br />irnvi"rr cucvzraicA�E��@fi'utrvrr-9 E8, -6i <br />Underline: Additions to Ordinance <br />Strike through: Deleted Text from Existing Ordinance <br />69 <br />C:\Documents and Settings\tlister\Desktop\Revised IRC Flood Protect Ord final 10-26-12.rtf <br />