Laserfiche WebLink
ORDINANCE 2012-020 <br />from the nearest high voltage powerline easement or right-of-way, <br />or from a collector or arterial road right-of-way if the facility is <br />screened from view of the collector or arterial roadway by a Type <br />"C" buffer or its equivalent. <br />3. The overall site containing the processing plant shall be 40 gross acres or <br />larger. <br />4. The plant equipment, processing areas, bio -fuel storage facilities, <br />feedstock storage and staging areas, parking areas, and transport <br />facilities shall occupy no more than 20 acres or 10% of the overall site <br />containing the processing plant, whichever is less. <br />5. No native upland habitat or forested wetlands shall be cleared or <br />removed in conjunction with development of the bio -fuel processing <br />plant and any associated power generation facility. <br />6. The applicant shall obtain approval from the Public Works Director for <br />the haul route. That approval may include conditions and guarantees <br />for haul route improvements and maintenance. <br />7. A power generation facility that is associated with the bio -fuel plant and <br />proiected to generate 50 megawatts of power or more shall be subiect to <br />the specific land use criteria and special exception process for "Public <br />and private utilities, heavy". <br />SECTION #4: <br />Establish LDR Section 971.08(16), to read as follows: <br />(16) Large-scale bio -fuel processing plants. <br />(a) Districts requiring special exception approval (pursuant to the provisions of <br />971.05): A-1 A-2 A-3 <br />(b) Additional information requirements: <br />1. A water supply and water use plan together with a report signed and <br />sealed from a professional engineer or professional geologist <br />demonstrating that the proposed use will have no significant adverse off- <br />site impacts to groundwater, surface water, water table levels, <br />stormwater management systems, irrigation systems, or agricultural <br />operations. <br />2 Design and operations information, demonstrating compliance with <br />applicable air emissions, effluent discharge, NPDES, fuel containment, <br />fire safety regulations, and county noise regulations applicable to <br />agricultural areas. <br />Bold Underline: Additions to Ordinance <br />StFike thFOugli Deleted Text from Existing Ordinance <br />C:\Documents and Settings\tlister\Local Settings\Temporary Internet Files\Content.Outlook\QPA7-MTU8\2012-020 971 Spec Land Uses.doc <br />