My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-020
CBCC
>
Ordinances
>
2010's
>
2012
>
2012-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 1:36:04 PM
Creation date
10/5/2015 9:15:14 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2012-020
Adopted Date
07/10/2012
Agenda Item Number
4.A.
Ordinance Type
Land Development Regulations
State Filed Date
07\18\2012
Entity Name
Fish Farms, Kennels, Biofuels, Self-Service Storage Facility,
Libraries, Recycling Centers, Group Homes, Worship, etc.
Code Number
Chapter 971
Subject
Specific Land Uses Amendments
Codified or Exempt
Codified
Supplemental fields
SmeadsoftID
11340
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 2012-020 <br />from the nearest high voltage powerline easement or right-of-way, <br />or from a collector or arterial road right-of-way if the facility is <br />screened from view of the collector or arterial roadway by a Type <br />"C" buffer or its equivalent. <br />3. The overall site containing the processing plant shall be 40 gross acres or <br />larger. <br />4. The plant equipment, processing areas, bio -fuel storage facilities, <br />feedstock storage and staging areas, parking areas, and transport <br />facilities shall occupy no more than 20 acres or 10% of the overall site <br />containing the processing plant, whichever is less. <br />5. No native upland habitat or forested wetlands shall be cleared or <br />removed in conjunction with development of the bio -fuel processing <br />plant and any associated power generation facility. <br />6. The applicant shall obtain approval from the Public Works Director for <br />the haul route. That approval may include conditions and guarantees <br />for haul route improvements and maintenance. <br />7. A power generation facility that is associated with the bio -fuel plant and <br />proiected to generate 50 megawatts of power or more shall be subiect to <br />the specific land use criteria and special exception process for "Public <br />and private utilities, heavy". <br />SECTION #4: <br />Establish LDR Section 971.08(16), to read as follows: <br />(16) Large-scale bio -fuel processing plants. <br />(a) Districts requiring special exception approval (pursuant to the provisions of <br />971.05): A-1 A-2 A-3 <br />(b) Additional information requirements: <br />1. A water supply and water use plan together with a report signed and <br />sealed from a professional engineer or professional geologist <br />demonstrating that the proposed use will have no significant adverse off- <br />site impacts to groundwater, surface water, water table levels, <br />stormwater management systems, irrigation systems, or agricultural <br />operations. <br />2 Design and operations information, demonstrating compliance with <br />applicable air emissions, effluent discharge, NPDES, fuel containment, <br />fire safety regulations, and county noise regulations applicable to <br />agricultural areas. <br />Bold Underline: Additions to Ordinance <br />StFike thFOugli Deleted Text from Existing Ordinance <br />C:\Documents and Settings\tlister\Local Settings\Temporary Internet Files\Content.Outlook\QPA7-MTU8\2012-020 971 Spec Land Uses.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.