My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-018
CBCC
>
Ordinances
>
2010's
>
2012
>
2012-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 1:33:55 PM
Creation date
10/5/2015 9:15:07 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2012-018
Adopted Date
07/10/2012
Agenda Item Number
4.A.
Ordinance Type
Land Development Regulations
State Filed Date
07\18\2012
Entity Name
Land Development Permit Waiver
Code Number
Chapter 913 and 914
Subject
Site Plan and Subdivision Platting
Codified or Exempt
Codified
Supplemental fields
SmeadsoftID
11338
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 2012-018 <br />E. The developer provides for an alternate route and/or <br />improvement that adequately accommodates pedestrian <br />traffic attracted or sEenerated by the proiect and <br />movement and eeer-dinates with an existing <br />s.�,tom or future sidewalk system. <br />Decisions by the community development director and the public works <br />director to approve, approve with conditions, or deny an exemption <br />request may be appealed to the planning and zoning commission <br />pursuant to the provisions of section 902.07. Planning and zoning <br />commission decisions regarding exemption requests may be appealed to <br />the board of county commissioners pursuant to the provisions of section <br />902.07. <br />d. Method. When required to construct or provide an internal sidewalk <br />segment(s), the developer shall: <br />i. Construct the required sidewalk segment(s) along the local <br />internal roadway or alternative route approved under subsection <br />913.09(5)(b)2.c.ii.E. As an alternative to "up front" construction, <br />the developer may delay construction by "bonding -out for <br />construction" of the segment(s) as described in subsection <br />913.09(5)(b)2.e. <br />e. Timing. The developer shall be responsible for providing his required <br />internal sidewalk segment(s) in compliance with subsections <br />913.09(5)(b)2.b. and 913.09(5)(b)2.d.i. above, prior to receiving a <br />certificate of completion for required subdivision improvements, with <br />the following exceptions: <br />i. The developer may delay construction of the required sidewalk <br />segment(s) beyond the final plat approval date of the <br />corresponding subdivision development if such delay is needed to <br />accommodate development of the common area or meet sidewalk <br />requirements for multiple phase projects. If the developer <br />qualifies for delay and elects to delay, then the developer shall <br />provide a completed contract for construction for remaining <br />required sidewalk improvements and post security to guarantee <br />the completed contract in conformance with subsection <br />913.10(1). The construction contract shall be for a period of <br />two (2) years and may be extended subject to payment of the <br />applicable extension fee adopted by the board of county <br />commissioners and the conditions and timeframes provided <br />in these regulations. The construction contract and security <br />arrangement may provide for annual reductions in the posted <br />security amount based on completed and inspected sidewalk <br />segments. Reduction requests are subject to payment of the <br />Bold Underline: Additions to Ordinance 1 1 <br />Stfi!W HFeegh: Deleted Text from Existing Ordinance <br />C:\Documents and Settings\tlister\Local Settings\Temporary Internet Files\Content.Outlook\QPAZMTU8\2012-018 913 and 914.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.