Laserfiche WebLink
ORDINANCE 2012-018 <br />approval date of the corresponding subdivision development. In electing <br />to bond -out for construction, the developer shall provide a completed <br />contract for construction for remaining required sidewalk improvements <br />and post security to guarantee the completed contract in conformance <br />with subsection 913.10(1) construction security requirements. The <br />developer shall have the ability to extend the contract for construction <br />and posted security for a period of two (2) years, in addition to the <br />original two (2) years, upon approval of both the public works director <br />and the community development director. <br />2. Internal sidewalk segments along local roadways. <br />a. Responsibility. The developer shall be responsible for providing internal <br />sidewalks along internal project roadways adjacent to project entrances <br />and common areas. TheseThose developer -provided sidewalks shall be <br />depicted on the approved project preliminary plat and land development <br />permit and shall be constructed in accordance with the timeframe for <br />the construction of required subdivision improvements. <br />The builder/lot owner shall be responsible for providing the sidewalk <br />required along his lot's street frontage, as depicted on the approved <br />project preliminary plat and land development permit. For subdivisions <br />platted prior to adoption of this provision (9-8-2009) and that have <br />outstanding oblieations for providing internal sidewalks, the <br />provision for builder/lot owner responsibility may be applied if <br />authorized by recorded covenants, restrictions, and lot owner <br />consent and, if applicable, morteagee consent, in a manner <br />acceptable to the county attorney's office, including a covenant that <br />the applicable covenants and restrictions cannot be modified or <br />terminated without county approval. The sidewalk segment shall be <br />constructed and inspected prior to the issuance of a certificate of <br />occupancy (C.O.) for the residence(s) on the builder's/lot owner's lot. <br />b. Multiple phase projects. In addition to the requirements of subsection <br />913.09(5)(b)2.a., above, the following requirements shall apply to <br />multiple phase projects that are under unified control. If a subdivision <br />consists of multiple phases that are under unified control, sidewalks must <br />be completed on ninety (90) percent of the lots in the preceding phase <br />prior to the issuance of a certificate of completion (C.C.) for the next <br />phase of the project. If a certificate of completion on a subsequent phase <br />is needed prior to the completion of ninety (90) percent of the sidewalks <br />in the preceding phase, then security, in conformance with subsection <br />913.10(1), construction security requirements, shall be posted to <br />guarantee construction of sidewalks needed to meet the ninety (90) <br />percent completion requirement for the preceding phase. <br />Bold Underline: Additions to Ordinance 9 <br />Stfike threugl} Deleted Text from Existing Ordinance <br />C:\Documents and Settings\tlister\Local Settings\Temporary Internet Files\Content.Outlook\QPAZMTU8\2012-018 913 and 914.doc <br />