Laserfiche WebLink
ORDINANCE 2012-025 <br />primary source of irrigation for a proiect may be approved by a ioint <br />decision of the County Utility Services Director, Public Works Director, <br />and the Community Development Director when it is determined that <br />there is no adequate available primary source of irrigation from effluent <br />re -use water or from a retention pond sized to meet applicable <br />stormwater management requirements. <br />SECTION #7: <br />Amend LDR Section 926.12(3), Replacement of required landscaping, to read as follows: <br />(3) Removal and rReplacement of required vegetation and required landscaping. <br />Required landseaping that has died or- has been r-emoved shall be r-eplaeed by fnater-ial whie <br />equivalen� to <br />(a) Vegetation (including trees) preserved on site as shown on an approved proiect <br />development plan (site plan) shall not be removed unless authorized under the <br />provisions and regulations of Chapter 927, Tree Protection and Land Clearing. <br />Where vegetation is removed, replacement of vegetation (including trees) shall <br />be provided as required below. <br />(b) Required landscape vegetation (including trees) planted on site during or after <br />project development may be removed and replaced if the vegetation has died, is <br />diseased or in declining condition, or has an adverse impact on health, safety, <br />site maintenance, or the visibility of authorized commercial signage. <br />(c) The size of replacement landscape vegetation shall be the size that the originally <br />planted material should have attained €1=emsince the time of project C.O. (certificate <br />of occupancy) or post-C.O. installation, as follows: <br />From zero (0) to eighteen (18) months after project C.O. or post-C.O. installation, <br />landscape materials must be replaced at a size no smaller than indicated on the approved <br />site plan. <br />More than eighteen (18) months but less than seven (7) years after project C.O. or <br />Post-C.O. installation, replacement shrubs shall be a minimum of thirty (30) inches in <br />height, replacement canopy trees shall be a minimum of sixteen (16) feet in height and <br />three (3) inches in diameter at 0.5 feet above grade, and replacement understory trees <br />shall be a minimum of seven (7) feet tall with a one and one-half (1 1/2) inch diameter <br />at 0.5 feet above grade. <br />• Seven (7) years or more after proiect C.O. or post-C.O. installation, replacement <br />canopy trees shall be a minimum of eighteen (18) feet in height and four (4) inches <br />in diameter at 1 foot above grade. <br />Bold Underline: Additions to Ordinance 9 <br />c. -i a *FOH "r• Deleted Text from Existing Ordinance <br />C:\Documents and Settings\tlister\Local Settings\Temporary Internet Files\Content.Outlook\QPAZMTU8\2012-025 918 and 926.doc <br />