My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/20/1983
CBCC
>
Meetings
>
1980's
>
1983
>
4/20/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:00 AM
Creation date
6/11/2015 3:12:36 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/20/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s � � <br />waste water treatment plants and distribution and coll -etion <br />systems, the project engineer for the Corporation shall -:certify, <br />under seal, that the systems have been constructed subs a-,xtla-lly <br />in accordance with the plans and specifications previously <br />approved. The certification shall include submission to the <br />County of two sets of "as -built" drawings, consisting,of, one set <br />in reproducible vellums and one set of regular blueline prints; <br />and that the systems meet all of the standards required; -by the <br />County, including pressure and leakage tests, chlorination and <br />bacteriological tests, infiltration and exfiltration tests. Upon <br />receipt of certification from the engineer, the County will <br />issue a letter acknowledging the construction of the sewerage <br />systems. No service is to be provided to customers until such <br />time as the County issues a letter of acknowledgment. The <br />issuance of said letter shall not be unreasonably withheld. <br />The Corporation shall grant necessary easements to County <br />without charge to connect the sewerage system to the County <br />Master Sewerage System together with such easements as are <br />necessary to provide access to the sewerage system, where and if <br />the County makes sewer service available to the project. The <br />Corporation shall pay a $1,000.00 franchise application fee at <br />the time of the submission of the franchise resolution, and <br />agree to pay all other fees which may be applicable during the <br />operation of the system. <br />SECTION VII <br />All of the facilities of the -Corporation shall be <br />constructed in accordance with the plans and specificiations <br />approved by the Department of Environmental Regulation of the <br />State of Florida -and Indian River County Utilities Department. <br />The manner of collection and disposal of sewage shall at all <br />times be and remain not inferior to the quality standards for <br />public sewage collection and other rules, regulations and <br />standards now or hereafter adopted by the Department of <br />-5- <br />APR 2 01983 5190K 53. PACE: 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.