My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/1/1983
CBCC
>
Meetings
>
1980's
>
1983
>
6/1/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:01 AM
Creation date
6/11/2015 3:33:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/01/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAFFIC SIGNAL MAINTENANCE AND OPERATION ORDER #3-83; <br />U.S. 1 at C-512 <br />The Board reviewed the following memo dated 5/24/83: <br />TO: HONORABLE MEMBERS OF THE BOARD DATE. May 24, 1983 FILE: <br />Of COUNTY COMMISSIONERS <br />THRU: Michael Wright, <br />County Administrator <br />James W. Davis, P <br />Public Works Director <br />FROM: Michael L. Orr ' /\;&, <br />Traffic Engineer <br />SUBJECT: Traffic Signal Maintenance and Operation <br />Order #3-83; U.S, 1 at C-512 <br />REFERENCES: <br />This is in response to a request from the Florida Department of Transportation to sign <br />the subject document prior to the start of the traffic signal design phase and funding <br />committment. - <br />DESCRIPTION AND CONDITIONS <br />X traffic engineering study of the intersection of U.S. 1 and County Road 512 was con- <br />ducted during January 1983 as petitioned by the City of.Sebastian and assigned by the <br />Transportation Planning Committee. The study recommended signalizing the subject in- <br />tersection due to significant traffic volume, which was subsequently approved by the <br />Transportation Planning Committee in February, 1983 and submitted to the F.D. O.T. <br />for approval. <br />ALTERNATIVES AND ANALYSIS <br />A. Approve installation of a traffic signal at U.S. 1 and C.R. 512 and <br />assume maintenance responsibilities. <br />B. Deny installation of a traffic signal at U.S. 1 and C.R. 512. <br />FUNDING AND RECOMMENDATION <br />The F.D.O.7. concurred with the study performed by the County and has scheduled install- <br />ation of the traffic signal during FY 84-85 with 100% state funding. <br />It is recommended to approve the installation of a traffic signal at the subject inter- <br />section using State funding by signing Traffic Signal Maintenance and Operation Order <br />#3-83 which commits the County to maintain the traffic signal after installation by <br />the F.D.O.T. <br />ON MOTION by Commissioner Wodtke, <br />SECONDED by Commissioner Scurlock, the <br />Board unanimously authorized for <br />signature by the Chairman the Traffic <br />Signal Maintenance and Operation Order <br />#3-83, as recommended by staff. <br />17 <br />L JUN 1 1983 <br />x .3 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.