My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/20/1983
CBCC
>
Meetings
>
1980's
>
1983
>
7/20/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:01 AM
Creation date
6/11/2015 3:02:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/20/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
54 ?AbdO2 <br />either of the following procedures. No construction may commence <br />until the applicant obtains a land development permit, see Section <br />7 (D) 1. <br />(a) Construction before Final Plat Approval. The <br />applicant shall submit construction plans and specifications as <br />required in Section 7 E. (3) of this ordinance together with a <br />request for land development permit. A certificate of ownership <br />shall accompany the request. The improvements required by this <br />ordinance and the preliminary plat approval shall be completed <br />prior to final plat approval, or <br />(b) Construction after Final Plat Approval. The <br />applicant shall submit construction plans and specifications as <br />required in Section 7 E. (3) of this ordinance for subdivision <br />improvements and obtain a Land Development Permit. The Land <br />Development Permit shall be submitted with a final plat drawing <br />for approval. Security will be required for the performance and <br />maintenance of all improvements which are to be constructed after <br />final plat approval (See Section 9 A.). <br />3) Plans and Specifications Required for a Land <br />Development Permit. The applicant shall furnish to the Public <br />Works Director the construction plans and specifications designed <br />in accordance with the approved preliminary plat and the require- <br />ments of this ordinance for the construction of all improvements. <br />The applicant must have obtained and shall submit all utility per- <br />mits and franchises required by the Indian River County Utility <br />Division and ordinances prior to the issuance of a land develop- <br />ment permit. All construction plans and specifications must be <br />prepared, signed and sealed by a professional engineer who is <br />registered in the State of Florida. Engineering calculations and <br />tests in support of any of the proposed plans and specifications <br />may be required. The drawings and required information shall be <br />so complete that review and analysis can be made from them without <br />research of any outside data. Three (3) copies of the plans shall <br />be submitted on twenty-four (24) inch by thirty-six (36) inch <br />sheets unless another size is approved by the County Public Works <br />Director, and shall contain, but shall not be limited to: <br />(a) a cover sheet, including a location map. <br />-26- <br />- M <br />
The URL can be used to link to this page
Your browser does not support the video tag.