My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/5/1983
CBCC
>
Meetings
>
1980's
>
1983
>
10/5/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:02 AM
Creation date
6/11/2015 3:36:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/05/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OUT 5 1993 ATTACHMENT "B" <br />JUSTIFICATION OF CHANGE ORDER NO. 3 <br />South Beach Water System <br />Improvements — Phase I <br />Indian River County, F1 <br />Item 1 - Pipe. Fittings for New Valves <br />As a result of the deletion of pipe fittings and valves as descti-bed in <br />Item 4, it is necessary to provide and install a 14" and 16" M,J. plug <br />at the points of tie-in to the existing 12" waterline. <br />Item 2 - Installation of New Valves <br />The City of Vero Beach requested the installation of two (2) valves in <br />the supply and discharge piping to and from the Fire Booster Station at <br />the existing 12" waterline located in the AiA right-of-way. This request <br />was made in an effort to isolate the Fire Booster Station system piping from <br />the existing 12" waterline in case of a pipe line break in said system. <br />The City of Vero Beach has supplied to the Contractor, the two valves required <br />for installation. This Item represents the labor cost to install the -valves. <br />Item 3 - Retainer Gland Installation <br />The City of Vero Beach has requested the Contractor to provide and install <br />retainer glands on new and existing valves and fittings in the system as <br />preventative maintenance measures in case of emergency situations such as <br />line breaks. The retainer glands purpose is to securethe valve or fitting to <br />the line so that under a situation of replacing pipe in the system, there <br />is less likely hood of a valve or fitting blowing off under system pressure. <br />Item 4 - Deletion of Proposed Valves & Fittings - <br />It has been determined that the proposed system can operate and function <br />effectively with the deletion of valves and fittings originally intended <br />for installation at the tie-ins at the Fire Booster Station. The deletion <br />of two 10" and one 12" M.J. valve, as well as two reducers and two plugs <br />is warranted in lieu of the 14" and 16" M.J. plugs provided in Item 1. <br />Item 5 - Deletion of Painting Floors in Pumping Stations <br />There are expected long term maintenance problems associated with the use <br />of the portable crane in the buildings as to the effects of that traffic on the <br />painted floor itself. It is recommended the floors not be painted to lessen <br />future repainting which may occur. <br />Item 6 - Deletion of Marblecrete Finish on Exterior of Fire Booster Station. <br />As a result of discussions between the South County Fire District and Indian <br />River County is has been determined the exterior of the Fire Booster Station <br />would be surfaced with a wood finish rather than a stucco or marblecrete finish <br />in an effort to match the exterior of the proposed fire station to be constructed <br />on the same site. The exterior of the building will be surfaced by the contractor <br />constructing the new fire station. <br />T� hii).;y .,`} S 3 *�yY`"°a�A Y _. j �' `t° ' <br />J �+ � G Mw}' •, <br />_ <br />- <br />.✓�.�'�`. _ ? <br />,i :wi" :•'+S'i'l�i�}L <br />,�'* <br />- , <br />�i .�. e fb •" ��Q��pyy�(�� <br />g®pj� � Y✓Y�w' <br />. .. <br />.. .. .. <br />L'- <br />t <br />_ <br />r.4 <br />F_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.