Laserfiche WebLink
Fr ­ <br />OCA` Z a 1983 <br />55rasp .74 <br />N. R. Frizzell Architects, Inc. <br />200 West Welbourne <br />Avenue <br />Winter Park, Florida <br />32769 <br />Indian River County Justice <br />Complex (305) 628-0620 <br />5 October 1983 <br />Project Cost Summary: <br />Corrections Facility <br />$ <br />5,872,000 <br />Off -Site Improvements: <br />Water <br />$ 90,000 <br />Sewer <br />105,000 <br />$ <br />195,000 <br />Equipment and Furnishings <br />$ <br />400,000 <br />Quality Control Tests: <br />Materials Testing <br />$ 8,000 <br />Soil Boring <br />8,000 <br />Survey <br />5,000 <br />$ <br />21,000 <br />Fees and Permits (Sewer and <br />Water Impact, DER) <br />$ <br />45,000 <br />Land (20 Acre Tract) <br />$ <br />140,000 <br />Architect's Fee <br />$ <br />401,000 <br />6.6% of Construction Plus <br />Off -Site Sewer <br />and Water, Only <br />Contingency <br />$ <br />300,000 <br />TOTAL <br />$ <br />7,374,000 <br />Inflation at 0.6 a/Month to Mid -Point of <br />Construction (9/11'85) for Construction, <br />Off -Site Improvements, and Equipment <br />and Furnishings $ 815,000 <br />TOTAL PROJECT COST $ 8,189,000 <br />Commissioner Lyons then brought to the Board's atten- <br />tion the concept of setting up a separate communications <br />center, possibly combining Civil Defense and the Sheriff's <br />communications in an attempt to obtain some funding. He <br />reported that he.also has a meeting set up to see about the <br />possibility of getting some other federal funding if we <br />would agree to tape some federal prisoners now and then, and <br />he will come back with a recommendation very shortly. <br />Chairman Bird inquired how we stand right now with the <br />architects, and Commissioner Lyons stated that they have <br />been authorized to give us a master plan of the whole <br />complex and site the buildings, and to proceed with the <br />schematic design of the jail facility. As a result of <br />73 <br />