My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/7/1983
CBCC
>
Meetings
>
1980's
>
1983
>
12/7/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:03 AM
Creation date
6/11/2015 3:50:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/07/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESCRIPTION AND CONDITIONS <br />6 <br />PACE59-9 <br />Fox Haven subdivision (formerly known as Cassara Heights <br />subdivision) is located on the north side of 4th Street, <br />approximately 1/4 mile east of 27th Avenue. The development <br />has 29 lots on a 20 acre parcel of land. The minimum lot size <br />is 1/2 acre. The zoning classification of the site is R-1 (6.2 <br />dwelling units/acre allowable building density). The subject <br />property's land use plan designation is LD -2 (6 dwelling <br />units/acre allowable building density). The proposed building <br />density is 1.45 dwelling units/acre. <br />ALTERNATIVES AND ANALYSIS <br />Fox Haven Subdivision received preliminary plat approval on <br />January 28, 1981. This approval would have expired on July 28, <br />1982; however a 12 month extension of plat approval was.granted <br />by the Board of County Commissioners.. This approval was <br />scheduled to expire on July 28, 1983. At that time, the <br />applicant had not yet begun construction on the site, and, <br />therefore, the Board granted a second extension of plat ap- <br />proval. This extension was granted for a period of 6 months <br />and so, will expire on January 28, 1984. <br />The applicant's agent has requested a third extension of plat <br />approval for a period of 60 days. The applicant has contracted <br />with a construction company to have the required on-site <br />improvements completed on February 13, 1984. At present, <br />grading of the road beds and construction of the subdivision's <br />interior roads are taking place. <br />Although there is a possibility that the project may be com- <br />pleted prior to the plat approval expiration date, the appli- <br />cant is requesting an extension. The reason for this request <br />is to allow for the possibility of inclement weather slowing <br />the progress of on-site construction.' If the extension request <br />is denied, the applicant has expressed the intention of posting <br />a bond in order to record the fina•1 plat. <br />According to the County's Subdivision Ordinance 75-3Jprelimi- <br />nary plat approval "shall have full force and effect for a <br />period of 18 months from the date of approval. An extension <br />may be granted by the Board. <br />RECOMMENDATION <br />Staff recommends that a <br />approval be granted to <br />the Board has granted <br />plat approval to those <br />extension would provide <br />However, the applicant <br />And the applicant does <br />pletion of construction <br />two month extension of preliminary plat <br />Fox Haven Subdivision. Historically, <br />one 18 month extension of preliminary <br />applicants who have requested it. This <br />the applicant with 2 additional months. <br />is progressing with the development. <br />have a contract guaranteeing the com- <br />within this 2 month period. <br />ON MOTION by Commissioner Scurlock, <br />SECONDED by Commissioner Lyohs, the Board <br />unanimously granted a two-month extension of <br />preliminary plat approval for Fox Haven <br />Subdivision. <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.