Laserfiche WebLink
EXHIBIT "B" <br />PINE CREEK WATER AND SEWER PLANT <br />OPERATING AND MAINTENANCE COSTS <br />ITEM <br />I. OPERATING AND MAINTENANCE (Water) <br />A. Electrical <br />B. Testing <br />C. Maintenance <br />D. Plant Operator <br />II. OPERATING AND MAINTENANCE (Sewer) <br />A. Electrical <br />B. Testing <br />C. Maintenance <br />D. Plant Operator <br />MONTHLY COST <br />RENEWAL AND REPLACEMENT (2 1/2%) <br />FRANCHISE FEE (6%) <br />TOTAL MONTHLY COST <br />COST/UNIT <br />CCL CONSULTANTS, INC. <br />BaoK 5 FA6E X577 <br />MONTHLY RATE <br />$ 350.00 <br />100.00 <br />200.00 <br />500.00 <br />300.00 <br />100.00 <br />200.00 <br />$2,250.00 <br />56.25 <br />$2,441.25 <br />$46.95/month <br />