Laserfiche WebLink
DISCUSSION RE 16TH STREET CHANGE ORDER <br />Public Works Director Davis informed the Board that the <br />16th Street project has progressed to where staff would like <br />to recommend some change orders as listed in the following <br />letter from Consulting Engineer Darrell McQueen. <br />LLOYD & AsSOCiATES. INC. <br />ENGINEERS AND SURVEYORS ROBERT F. LLOYD <br />REGISTERED CIVIL ENGINEER 3538 <br />REFORTS REGISTERED LAND SURVEYOR 944 <br />DESIGNS <br />SUPERVISION <br />APPRAISALS <br />CONSULTATIONS <br />February 15, 1984 <br />Mr. James W. Davis, P.E. <br />County Engineer <br />Indian River County <br />1 1840 25th Street <br />Vero Beach, FL 32960 <br />re:16th Street Improvements <br />Dear Jim, <br />I <br />(305) 562-4112 <br />1935 30TH STREET <br />VERO BEACH, FLORIDA <br />3z96n <br />Listed below are the specific items in the Change Order, and <br />the prices Dickerson has submitted for same: <br />1) Change order from Limerock to Coquina <br />2) 20th Avenue North Extension <br />3) Right turn lane @ 10th Avenue <br />4) East Bound Lane 10th Avenue to end of job <br />5) 12th Street and 20th Avenue <br />�f`y -) Flashing Beacons ( 4 ) <br />7) F.E.C. Insurance <br />8) Parking Lot <br />V Alternate A (228 paved spaces) <br />Alternate B ( 92 paved spaces & 136 stabilized <br />(& sodded spaces) <br />4 9) Pipe @ 27th Avenue <br />Alternate (extend w/ 72" RCP) <br />Alternate (remove 48" RCP & place 72" RCP) <br />Alternate E (remove 48" RCP & place 108" RCP) <br />(-$ 67,315.91) <br />$ 22,466.52 <br />$ 4,023.92 <br />$ 14,260.12 <br />$ 3,626.47 <br />$ 10,605.00 <br />$ 150.00 <br />$127,660.75 <br />$111,924.31 <br />$ 45,684.40 <br />$ 97,082.40 <br />$215,450.40 <br />All three pipe alternatives reflect a deduction of $25,317.60, <br />which was the cost of the 48" RCP contained in the original <br />contract. <br />If you have any questions, let us know. <br />Sin drely, <br />•L Yiti1.L E-1 Z - �' <br />Darrell E. McQueen, P.E.' <br />49 <br />FEB 22 1994 <br />a�� 56. PnE20"' <br />A <br />;;ate <br />�� <br />t <br />�'j►ffr� <br />V�1 <br />(305) 562-4112 <br />1935 30TH STREET <br />VERO BEACH, FLORIDA <br />3z96n <br />Listed below are the specific items in the Change Order, and <br />the prices Dickerson has submitted for same: <br />1) Change order from Limerock to Coquina <br />2) 20th Avenue North Extension <br />3) Right turn lane @ 10th Avenue <br />4) East Bound Lane 10th Avenue to end of job <br />5) 12th Street and 20th Avenue <br />�f`y -) Flashing Beacons ( 4 ) <br />7) F.E.C. Insurance <br />8) Parking Lot <br />V Alternate A (228 paved spaces) <br />Alternate B ( 92 paved spaces & 136 stabilized <br />(& sodded spaces) <br />4 9) Pipe @ 27th Avenue <br />Alternate (extend w/ 72" RCP) <br />Alternate (remove 48" RCP & place 72" RCP) <br />Alternate E (remove 48" RCP & place 108" RCP) <br />(-$ 67,315.91) <br />$ 22,466.52 <br />$ 4,023.92 <br />$ 14,260.12 <br />$ 3,626.47 <br />$ 10,605.00 <br />$ 150.00 <br />$127,660.75 <br />$111,924.31 <br />$ 45,684.40 <br />$ 97,082.40 <br />$215,450.40 <br />All three pipe alternatives reflect a deduction of $25,317.60, <br />which was the cost of the 48" RCP contained in the original <br />contract. <br />If you have any questions, let us know. <br />Sin drely, <br />•L Yiti1.L E-1 Z - �' <br />Darrell E. McQueen, P.E.' <br />49 <br />FEB 22 1994 <br />a�� 56. PnE20"' <br />