My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/7/1984
CBCC
>
Meetings
>
1980's
>
1984
>
3/7/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:23 AM
Creation date
6/11/2015 4:36:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/07/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR 71984 <br />BQa 56 PRCf 384.. <br />set forth in the aforementioned Contract for Required Improvements, which agree- <br />ment is attached hereto and incorporated herein by reference (Contract). <br />2. Upon completion of any distinct or separable phase or improvements, <br />or independent portion thereof, the Developer may obtain a disbursement from the <br />escrow account by making a written request to the Board of County Commissioners <br />of Indian River County through the County's Public Works Director. The request <br />shall specify the amount of disbursement desired and shall be accompanied by a <br />sealed certificate from Developer's engineer describing the work completed, the <br />actual cost thereof, the estimated cost of all remaining work which is secured <br />by the escrow account, and that the work for which disbursement is requested <br />has been completed in accordance with the most recent set of plans and specifi- <br />cations approved and on file with the County. <br />3. The amount of any given disbursement shall not exceed eighty (80%) <br />percent of the total cost of improvements certified as being completed under the <br />preceding paragraph; i.e., twenty (20%) percent of the cost of each phase, improve- <br />ment, or portion thereof, shall be retained in the escrow account until the <br />final reduction, which shall occur only after issuance of --a Certificate of <br />Completion in accordance with the County's Subdivision and Platting Ordinance. <br />4. Nothwithstanding the above disbursement limits, at no time shall <br />the escrow account balance be reduced below an amount equal to one hundred <br />fifteen (115%) percent of the most recent approved cost estimate of the remaining <br />required improvements. <br />5. Within seven (7) working days after receipt of a disbursement <br />request, the Public Works Director shall cause an inspection of the work for <br />which payment is sought. If the Public Works Director is satisfied in all respects <br />-2- <br />11FI <br />
The URL can be used to link to this page
Your browser does not support the video tag.