My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/7/1984
CBCC
>
Meetings
>
1980's
>
1984
>
3/7/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:23 AM
Creation date
6/11/2015 4:36:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/07/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Lyons, SECONDED <br />by Commissioner Wodtke, the Board unanimously <br />authorized repairs to the Caterpillar Bulldozer <br />tracks as recommended by staff. <br />s <br />I. Installation of Cablevision Cable inside Conduit on the <br />Wabasso Bridge <br />The Board reviewed the following memo from the Public. <br />Works Director: <br />TO: The Honorable Members DATE: February 21, 1984 FILE: <br />of the Board of County Commissioners <br />THROUGH: Michael Wright, <br />County Administrator <br />SUBJECT: Request by Florida Cablevision <br />to Install a Cable Inside a 3" <br />PVC Conduit on the-Wabasso Bridg <br />at CR 510 <br />FROM: games W., -Davis, P.E.'; �yREFERENCES: <br />Public Works Director <br />DESCRIPTION AND CONDITIONS <br />Florida Cablevision is requesting to install a Television Cable <br />along the North side of the Wabasso Bridge. This cable -'will be <br />encased within'a3" diameter PVC conduit, and hangers will be <br />connected to the outside of the curb superstructure of the concrete <br />bridge. <br />ALTERNATIVES AND ANALYSIS <br />The existing utilities which are currently suspended from the <br />bridge consist of a 16" water main on the south side, known•as <br />the Lost Tree Village water line. <br />There is availability for future utility corridors on the bridge, <br />however, all requests should be carefully reviewed and priorities <br />established for future utilization. <br />The County requested the DOT approve this installation and Public <br />Works is awaiting their reply. <br />RECOMMENDATIONS <br />It is recommended that the County permit this installation upon <br />the Utility Company agreeing to relocate or remove the installation <br />if future use by the County or by a County approved installation <br />required the corridor. <br />13 <br />Bt4K PACE <br />
The URL can be used to link to this page
Your browser does not support the video tag.