Laserfiche WebLink
Indian River County Department of Utilities <br />COST ESTIMATE and CONTRACTOR'S BID ITEM LIST <br />Project: 129th Place Subdivision Water Assessment <br />Description: WIP #473- UCP # <br />17 -Jul -IIB <br />Bid <br />&d Dem <br />Record Drawing <br />$1,500.00 <br />LABOR COSTS <br />$1,000.00 <br />MATERIAL COSTS <br />$500.00 <br />Permitting <br />Item No. <br />Deecri tion <br />Es <br />Estimated <br />Unit of <br />Mtr <br />LaUnif Tntal <br />Labor <br />Material or <br />Total Material <br />Total <br />uantitV <br />Measure <br />Price <br />Price <br />Price <br />Price <br />Price <br />77 <br />Mobilization, Demobilization, MOT <br />01c <br />.Install 6" PVC Water Main <br />1 <br />640 <br />LS <br />3,000.00 <br />$3 000,00 <br />Olb <br />Ins [all 4"PVC Water Main <br />140 <br />LF <br />$9.00 <br />5,760.00 <br />$4.10 <br />2,624.00 <br />$8,384,00 <br />OSa <br />Install 4" HDPE Horizontal Directional Drill <br />80 <br />LF <br />$6.00 <br />840.00 <br />$2.50 <br />350.00 <br />$1,190.00 <br />03a <br />Install 6" Drivewa Bore <br />50 <br />LF <br />$30.00 <br />2,400.00 <br />$3.00 <br />240.00 <br />$2,640.00 <br />03a <br />Insta114" Drivewa Bore <br />LF <br />$25.00 <br />1,250.00 <br />$ <br />14b <br />Install 12" X 6" SS Wet Tap w/ 6" GV&B <br />30 <br />LF <br />$25.00 <br />750.00 <br />$750.00 <br />5750.00 <br />07 <br />Install MRJDI Fittin- s <br />I <br />EA <br />$1,200.00 <br />1,200.00 <br />$1,500.00 <br />1,500.00 <br />$2700.00 <br />17c <br />Install 6" GV&B <br />0.25 <br />Tons <br />$4,000.00 <br />1,000.00 <br />$2,500 <br />625.00 <br />$1,625.00 <br />17b <br />Install 4" GV&B <br />I <br />EA <br />$400.00 <br />400.00 <br />.600.00 <br />600.00 <br />$1,000.00 <br />19b <br />Install FHA w/ 6" GV&B <br />1 <br />1 <br />EA <br />$300.00 <br />300.00 <br />450.00 <br />450.00 <br />$750.00 <br />16e <br />Install 1-1/2" PE WaterService DBL Short) <br />EA <br />$1,200.00 <br />1,200.00 <br />2,400.00 <br />2,400.00 <br />$3,600,00 <br />16m <br />Install I-1/2" PE WaterService (DBL Lon) <br />3 <br />EA <br />$800.00 <br />800.00 <br />550.00 <br />550.00 <br />$1.,350.00 <br />16a <br />Install I" PE Water Service(SGL Short) <br />EA <br />$],100.00 <br />3,300.00 <br />600.00 <br />1,800.00 <br />$5 100.00 <br />16i <br />Install I " PE Water Service (SGL Lon <br />2 <br />EA <br />$800.00 <br />11600.00 <br />300.00 <br />600.00 <br />$2,200,00 <br />24b <br />Install Temp. 2" Jumper <br />1 <br />EA <br />$1,100.00 <br />1,100.00 <br />300.00 <br />30000 <br />$140000 <br />1 EA 1 $400.00 400.00 700.00 700.00 $1100.00 <br />$25,300 $12,739.00 $38,039.00 <br />Est. Construction Cost for Assessment Project $38,039.00 <br />10% Contingency <br />3,804.00 <br />ASSESSMENT ESTIMATED CONSTRUCTION COST$41,843.00 <br />Surveying <br />$2,500.00 <br />Record Drawing <br />$1,500.00 <br />Design <br />$1,000.00 <br />Bidding & Award <br />$500.00 <br />Permitting <br />$500.00 <br />Construction Services <br />$1,000.00 <br />Administrative <br />$1,000.00 <br />ESTIMATED TOTAL ASSESSMENT PROJECT COST $49,843.00 <br />