Indian River County Department of Utilities
<br />COST ESTIMATE and CONTRACTOR'S BID ITEM LIST
<br />Project: 129th Place Subdivision Water Assessment
<br />Description: WIP #473- UCP #
<br />17 -Jul -IIB
<br />Bid
<br />&d Dem
<br />Record Drawing
<br />$1,500.00
<br />LABOR COSTS
<br />$1,000.00
<br />MATERIAL COSTS
<br />$500.00
<br />Permitting
<br />Item No.
<br />Deecri tion
<br />Es
<br />Estimated
<br />Unit of
<br />Mtr
<br />LaUnif Tntal
<br />Labor
<br />Material or
<br />Total Material
<br />Total
<br />uantitV
<br />Measure
<br />Price
<br />Price
<br />Price
<br />Price
<br />Price
<br />77
<br />Mobilization, Demobilization, MOT
<br />01c
<br />.Install 6" PVC Water Main
<br />1
<br />640
<br />LS
<br />3,000.00
<br />$3 000,00
<br />Olb
<br />Ins [all 4"PVC Water Main
<br />140
<br />LF
<br />$9.00
<br />5,760.00
<br />$4.10
<br />2,624.00
<br />$8,384,00
<br />OSa
<br />Install 4" HDPE Horizontal Directional Drill
<br />80
<br />LF
<br />$6.00
<br />840.00
<br />$2.50
<br />350.00
<br />$1,190.00
<br />03a
<br />Install 6" Drivewa Bore
<br />50
<br />LF
<br />$30.00
<br />2,400.00
<br />$3.00
<br />240.00
<br />$2,640.00
<br />03a
<br />Insta114" Drivewa Bore
<br />LF
<br />$25.00
<br />1,250.00
<br />$
<br />14b
<br />Install 12" X 6" SS Wet Tap w/ 6" GV&B
<br />30
<br />LF
<br />$25.00
<br />750.00
<br />$750.00
<br />5750.00
<br />07
<br />Install MRJDI Fittin- s
<br />I
<br />EA
<br />$1,200.00
<br />1,200.00
<br />$1,500.00
<br />1,500.00
<br />$2700.00
<br />17c
<br />Install 6" GV&B
<br />0.25
<br />Tons
<br />$4,000.00
<br />1,000.00
<br />$2,500
<br />625.00
<br />$1,625.00
<br />17b
<br />Install 4" GV&B
<br />I
<br />EA
<br />$400.00
<br />400.00
<br />.600.00
<br />600.00
<br />$1,000.00
<br />19b
<br />Install FHA w/ 6" GV&B
<br />1
<br />1
<br />EA
<br />$300.00
<br />300.00
<br />450.00
<br />450.00
<br />$750.00
<br />16e
<br />Install 1-1/2" PE WaterService DBL Short)
<br />EA
<br />$1,200.00
<br />1,200.00
<br />2,400.00
<br />2,400.00
<br />$3,600,00
<br />16m
<br />Install I-1/2" PE WaterService (DBL Lon)
<br />3
<br />EA
<br />$800.00
<br />800.00
<br />550.00
<br />550.00
<br />$1.,350.00
<br />16a
<br />Install I" PE Water Service(SGL Short)
<br />EA
<br />$],100.00
<br />3,300.00
<br />600.00
<br />1,800.00
<br />$5 100.00
<br />16i
<br />Install I " PE Water Service (SGL Lon
<br />2
<br />EA
<br />$800.00
<br />11600.00
<br />300.00
<br />600.00
<br />$2,200,00
<br />24b
<br />Install Temp. 2" Jumper
<br />1
<br />EA
<br />$1,100.00
<br />1,100.00
<br />300.00
<br />30000
<br />$140000
<br />1 EA 1 $400.00 400.00 700.00 700.00 $1100.00
<br />$25,300 $12,739.00 $38,039.00
<br />Est. Construction Cost for Assessment Project $38,039.00
<br />10% Contingency
<br />3,804.00
<br />ASSESSMENT ESTIMATED CONSTRUCTION COST$41,843.00
<br />Surveying
<br />$2,500.00
<br />Record Drawing
<br />$1,500.00
<br />Design
<br />$1,000.00
<br />Bidding & Award
<br />$500.00
<br />Permitting
<br />$500.00
<br />Construction Services
<br />$1,000.00
<br />Administrative
<br />$1,000.00
<br />ESTIMATED TOTAL ASSESSMENT PROJECT COST $49,843.00