My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/4/1984 (2)
CBCC
>
Meetings
>
1980's
>
1984
>
4/4/1984 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:24 AM
Creation date
6/11/2015 4:40:25 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
04/04/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR <br />4 1984BOOK ' WPACE 655' <br />article, the term off-site shall defined as those mains, water <br />transmission lines, sewage collection lines, sewage force mains <br />and/or pumping stations necessary to connect to the developer's <br />property with facilities of the County adequate in size to trans- <br />mit to the developer's property an adequate quantity of water <br />under adequate pressure and/or transmit sewage collected on the <br />developer's property to the treatment plant or disposal site of <br />the County. It is the County's policy to expand its water and <br />sewerage system in an orderly, economical manner and in those <br />cases in which the County would not normally be expanding its <br />system to serve a developer's project at that time and such an <br />extension would require an extraordinary expenditure by the County <br />for transmission facilities and such expenditure does not fall <br />within the "norm" associated with the County's standard impact fee <br />then such developer shall be required to construct or pay the cost <br />of off-site facilities associated with his project. In this <br />event, the County shall negotiate an. agreement with the developer <br />requesting service setting forth the developer's responsibility <br />for off-site facilities and the County's responsibility for <br />requiring such facilities to be oversized to meet future demands. <br />B. Refundable advances. The County may require, in <br />addition to the contribution in aid of construction of off-site <br />facilities herein set forth, a refundable advance by the developer <br />to further temporarily defray the cost of any "off-site" extension <br />of water and/or sewer mains and pumping stations necessary to <br />connect the developer's property with the then terminus of the <br />County's water and sewer facilities. This provision recognizes <br />instances in which a developer may be required to advance funds to <br />construct off-site facilities sized in accordance with the <br />County's Master Plan. All amounts expended by the developer pur- <br />suant to such an agreement over and above the developer's <br />hydraulic share for off-site facilities shall be refunded to <br />developer in accordance with the terms and conditions of a <br />refunding agreement which the County will execute with the <br />developer. County may assume a portion of the material cost of <br />such projects when it deems it to be in the best interest of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.