A P R 4 1984
<br />RATES AND CHARGES
<br />Water
<br />Minimum Charge (Includes No Consumption)
<br />BOOK 56 FAGF 66;''
<br />Base Facilities Charge......... .............$5.34/ERU
<br />Customer Charge: ............................... 1.82/Meter
<br />Volume Charge,,,. , ...........................1,99/1,000 gallons
<br />Water Production Charge.............................1.72/1,000 gallons
<br />Sewer
<br />Minimum Charge (Includes No Consumption)
<br />Base Facilities Charge ..................... .1.53/ERU
<br />Customer Charge................................1.84/Meter
<br />*Volume Charge.......................................2.86/1,000 gallons
<br />*Only applied to first 12,000 gallons of Water Consumption on each
<br />Residential ERU.
<br />SPECIFIC SERVICE CHARGES
<br />Water Service Connection
<br />5/8" Meter...................................$345.00
<br />1" Meter........... ................... .402.00
<br />1 1/2" Meter....................................706.00
<br />Larger than 1 1/2" Meter ...................... .Cost Plus Overhead
<br />Sewer Service Connection
<br />Residential Unit............................$440.00
<br />Commercial and Other .........................Cost Plus Overhead
<br />Meter Installation
<br />5/8" Meter....................................115.00
<br />1" Meter....................................170.00
<br />1 1/2" Meter....................................440.00
<br />2" Meter...... ........................ ...550.00
<br />3" Meters andabove...........................Cost plus Overhead
<br />Fire Hydrant Meter...........................15.00
<br />Reconnect (Turn -on Fee)
<br />During Working Hours ,,,,,,,,,,,,,,,,,,,,,,,,,,12.00
<br />After Working Hours...........................21.00
<br />Meter Reread and Leak Inspection ...................12.00
<br />Delinquency Charge (Late Payment Processing) ........ 1.50 Plus 1 1/2%
<br />General Service Calls.............................Cost Plus Overhead
<br />Meter Calibration (deter Testing)
<br />5/8" Meter.....................................15.00
<br />1" Meter.. ............ ,, 15.00
<br />1 1/2" Meter orLarger„,,,,,,,,,,,,,,,,,,,,,,Cost plus Overhead
<br />Damage Repair (Repair Water & Sewer Break),,,,,,,, 100.00 Plus Cost
<br />Engineering Services
<br />Site Plan Review
<br />Under 40 units without a liftstation..... 50.00 Minimum
<br />Over 40 units or a deve.lonment with
<br />liftstation...........................150.00 Minimum
<br />_ APP "A”
<br />P.
<br />
|