Laserfiche WebLink
RPR 4 4 BOOK 56 wE623 <br />Meter Calibration (`deter Testing) <br />5/8" Meter................................15.00 <br />1" Neter................................15.00 <br />1 1/2" Meter...............................Cost Plus Overhead <br />Damage Repair (Repair Water & Sewer Break).... 100.00 Plus Cost <br />Engineering Services <br />Site Plan Review <br />Under 40 units without a liftstation.... 50.00 Minimum <br />Over 40 units or a development with <br />liftstation .........................150.00 Minimum <br />Inspection Fee <br />Residential or Commercial <br />Water..................................20-OO/Per ERU <br />Sewer..................................20.00/Per ERU <br />Hydrant Flow Calibration ...............50.00/Test <br />Annual Fire Protection Charge <br />2" Meter..................................24.00 <br />3" Meter..................................49.50 <br />4" Meter ......................... .......75.00 <br />6" Meter or Fire Hydrant.................150.00 <br />8" Meter.................................240.00 <br />Impact Fee <br />Water ....................................380.00/ERU <br />Sewer....................................540.00/ERU <br />Other <br />Deposits <br />Residential or Commercial . <br />Water ...................................40.00/Per ERU <br />Sewer...................................40.00/Per ERU <br />Hydrant Meter............................300.00 <br />Charge for Returned Checks .....................10-OO/Per Check <br />Issuing a Duplicate Bill ........................1.00 <br />Water Tapping Charge <br />3/4" Line................................186.50 <br />1" Line............ ..................186.50 <br />1.1/2" Line.................................205.00 <br />2" Line and Over.......................Cost Plus Overhead <br />5 <br />8 <br />