My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/11/1984
CBCC
>
Meetings
>
1980's
>
1984
>
4/11/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:24 AM
Creation date
6/11/2015 4:41:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/11/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR PAVING OF APPLE WAY <br />The Board reviewed the following letter from Al Gilman <br />of Apple Way: <br />_tip h�_.r?11-Ss i O h Nr r <br />171-1Y 2�� �-- 1 "h /t1✓ r'`c� 4 s <br />---- <br />--U &=T �'l/ U/ 2 y Y e r <br />n. <br />Public Works Director Davis reported that as a result <br />of the property owners' request, the Public Works Department <br />developed a cost estimate to bring the road up to County <br />standards. They have met with the property owners, who now <br />are coming back to the Commission and requesting that the <br />County proceed with developing the road. This would be <br />assessed 100% to the owners in Apple Way Subdivision and <br />once the reconstruction is complete, the road would be <br />dedicated to the County. <br />Commissioner Wodtke asked if we first would get the <br />money in escrow for the project and then proceed, and Mr. <br />Davis confirmed that was the intent and the preliminary <br />33 <br />APR 111984 Boo 56' PA 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.