Laserfiche WebLink
5. Sludge Disposal Options <br />Secretarial (WP II) <br />8 <br />hrs. <br />@ <br />$ <br />26.50 <br />= $ <br />212.00 <br />Draftsman IV <br />8 <br />hrs. <br />@ <br />$ <br />35.00 <br />= $ <br />280.00 <br />Engineer III <br />16 <br />hrs. <br />@ <br />$ <br />39.00 <br />= $ <br />624.00 <br />Engineer IV <br />8 <br />hrs. <br />@ <br />$ <br />46.00 <br />= $ <br />368.00 <br />Engineer VI <br />8 <br />hrs. <br />@ <br />$ <br />61.00 <br />= $ <br />488.00 <br />Engineer VIII <br />4 <br />hrs. <br />@ <br />$ <br />82.50 <br />= $ <br />330.00 <br />$ 2,302.00 <br />D.Report Writing <br />1. Final Report <br />Secretarial (WP II) 40 hrs. @ $ 26.50 = $ 1,060.00 <br />Draftsman IV 24 hrs. @ $ 35.00 = $ 840.00 <br />Engineer III 40 hrs. @ $ 39.00 = $ 1,560.00 <br />Engineer IV 64 hrs. @ $ 46.00 = $ 2,944.00 <br />Senior Planner (E V) 16 hrs. @ $ 53.50 = $ 856.00 <br />Engineer VI 40 hrs. @ $ 61.00 = $ 2,440.00 <br />Engineer VIII 20 hrs. @ $ 82.50 = $ 1,650.00 <br />$11,350.00 <br />2. Meetings <br />Engineer IV <br />Engineer VI <br />Engineer VIII <br />1142m/116P/040584 <br />4 hrs. @ $ 46.00 = $ 184.00 <br />8 hrs. @ $ 61.00 = $ 488.00 <br />12 hrs. @ $ 82.50 = $ 990.00 <br />$ 1,662.00 <br />Sub -Total <br />Printing Allowance <br />Total <br />Budget <br />Page 5 of 6 <br />MAY 2 3 1984 95 BOOK <br />,$23,102.00 <br />$13,012.00 <br />$55,738.00 <br />$ 1,000.00 <br />$56,738.00 <br />$57,000.00 <br />57 PnE258 <br />