My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/13/1984
CBCC
>
Meetings
>
1980's
>
1984
>
6/13/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:24 AM
Creation date
6/11/2015 4:27:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/13/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r - <br />JUN 131984 <br />r <br />BOOK 57 FACE 39 <br />ON MOTION by Commissioner Bird, <br />SECONDED by Commissioner Lyons, the Board <br />unanimously (4-0) approved final payment of <br />$544.50 to Sunnyland Irrigation for construction <br />of an irrigation system at the Tracking Station <br />Park, and approved Change Order No. 8102 -IV -2, <br />extending the completion date by 179 calendar <br />days, as recommended by Public Works Director <br />Jim Davis. <br />' <br />PROJECT NO. <br />Imim RIVER CO[]rm <br />(DPW) <br />DPW - ENGINEERING DIVISION <br />PROJECT NO. <br />PERIODIC ESTIMATE FOR PARTIAL PAYMENT <br />(OTHER) <br />CONTRACT DIVISION <br />AE AND LOCATION OF PROJECT . <br />! " t, ! A " /�, v E. C. 1 l0-/ r_ e.1 1-Ja S-figTi rn! g 1 0 <br />AE AND ADDRESS OF CONTRACTOR <br />� U ^I nl y L -l-1 nl a �G2) G A % I cnl <br />/3 v.4 2v PP L,AnJE <br />L -P► kms.V�/o t'L-T7a F=L- <br />=1_--.RIODIC <br />31001CESTIMATE NO. FOR PERIOD 19 - To 19— <br />9 -COST <br />COSTOF WORK COMPLETED TO DATE UNDER ORIGINAL CONTRACT ONLY <br />Entries must be limited to work and costs under the original contract only. <br />(Work and cost data under change orders Is to be shown In Part 2 of this form.) <br />Columns (1) througn (5). Enter data shown In the proposal of original executed Contract. Engineering Division shall approve completion of this <br />form at this step prlo: to Contra=tor completing columns 6 through 9 and Part 2 through Part 5. <br />Columns (6) and (7). Show all work completed to date under original contract. <br />Column (8). Enter the difference between entries In columns (5) and (7). <br />Column (9). Show percent ratio of column (7) to column (5). <br />CONTRACT <br />COMPLETED TO DATE <br />COST OF <br />.M <br />DESCRIPTION OF ITEM <br />COST PER <br />TOTAL COST <br />UNCOMPLETED <br />COMP <br />QUANT. <br />UNIT <br />UNIT <br />QUANT, <br />TOTALCOST <br />WORK <br />(2) <br />(3) <br />(4) <br />(5) <br />(6) <br />(7) <br />le) <br />(9) <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.