Laserfiche WebLink
RESOLUTION 20492010 - <br />identified below; or 2) a local government developer's agreement has been executed <br />and attached as an exhibit to the DO. Surety shall be provided to the satisfaction of <br />Indian River County or the Florida Department of Transportation that sufficient funds <br />will be available to complete the following intersection improvements, including <br />signalization modifications as warranted by County or State criteria. <br />• 53rd Street and 58th Avenue: Signalize intersection and add left <br />turn lanes on the north, south, and east ail approaches. <br />• 53rd Street/Project entrance (51St Court): Install flasher <br />convertible signal,- and provide a generator for testing if power <br />is not available by January 1, 2011. <br />• 531 Street/43r1 Avenue: Install flasher convertible signal. <br />• 49th Street/431 Avenue: Install flasher convertible signal. <br />• 49th Street/Project Entrance (51St Court): Install flasher <br />convertible signal. <br />20. No building permits for Waterway Village DRI shall be issued for more than 337 <br />dwelling units or after December 31, 2005, whichever occurs later, until either: 1) a <br />contract has contracts have been let for the intersection improvement improvements <br />identified below; or 2) theimprovement improvements <br />identified below has have been included within the first two years of either the Indian <br />River County adopted Road Building Program, or the Florida Department of <br />Transportation adopted Five Year Work Program; or 3) a local government <br />developer's agreement has been executed and attached as an exhibit to the DO. <br />Surety shall be provided to the satisfaction of Indian River County or the Florida <br />Department of Transportation that sufficient funds will be available to complete the <br />following roadway and intersection improvement improvements, including <br />signalization modifications as warranted by County or State criteria. <br />•--49th Street and 58th Avenue: Signalize intersection and add left <br />turn lanes anon all approaches, <br />• 45th Street and 58th <br />turn lanes anon all approaches,, <br />• 53rd Street anlfrom 58th Avenue to the project entrance <br />Court) as a two lane roadway. <br />(51St <br />20a. No later than six months after such time as the traffic modeling done in <br />conjunction with the Annual Report determines that the traffic volumes on 58th <br />Avenue between 49th Street and 53rd Street exceed the adopted level of service or <br />b Janua 1 2015 whichever occurs first the four -lapin• of 58th Avenue <br />between 49th Street and 53rd Street shall be commenced and shall be completed <br />within twelve months after commencement. In the event the developer fails to <br />commence construction within six months of the date the traffic modeling is <br />submitted or by January 1, 2015 whichever occurs first or fails to complete <br />construction within twelve months after commencement, the County shall cease <br />RM: 7375429: 1 <br />7 <br />