Laserfiche WebLink
approval prior to the commencement of construction of 53rd Street. Utility relocation <br />shall be included. <br />A. The County shall have the right to approve the scope of work and <br />compensation for the design and engineering phase of this project. The County <br />shall not unreasonably withhold or delay such approval. Failure to reply to the <br />Developer within thirty (30) days shall constitute approval. <br />B. The Developer and the County shall share equally the cost of <br />construction, design, and engineering of 53rd Street from 58th Avenue to the east <br />property line of Waterway Village -,i provided, however, that the County's <br />obligation for the cost of landscaping shall be limited to one-half of $100,000.00 <br />per mile. The Developer shall fund and install all border landscaping. <br />C. The Developer shall have no responsibility for the design, <br />engineering, or construction costs of 53rd Street east of the Developer's east <br />property boundary, or for the bridges across Lateral H and North Relief canals. <br />D. The de-ve-4-ep&Developer's obligation with respect to 53rd Street, <br />identified in the Amended and Restated Development Order and otherwise, shall <br />be deemed satisfied so long as the Developer is in compliance with this Amended <br />Agreement, and the County shall not withhold any approval or permit because of <br />the condition of 53rd Street as long as the Developer is in compliance with this <br />Amended Agreement. <br />E. At the time the County accepts title or dedication from the <br />Developer for the 53rd Street right-of-way, the County shall execute a release of <br />any interest the County has in Murphy Act right -of- way for the existing 53rd <br />Street located in Sections 21 and 22, Township 32, South, Range 39 East, Indian <br />River County, Florida, including, but not limited to, the reservation of road right- <br />of-way described in Deed Book 66 Page 35, Deed Book 67 Page 267 and Deed <br />Book 60 Page 86, Public Records of Indian River County, Florida_ <br />=17 F. The construction of 53rd Street as described above will require the <br />excavation of a lake to receive the drainage from 53rd Street ("the Lake"). The <br />Develo • er agrees to dig the Lake, to install the required drainage Dies from 53rd <br />Street, and to allow 53rd Street to drain into the Lake and thereafter to furnish <br />as.ro.riate ea ements t• the Count f• the use maintenance and re.1 cement of <br />such piping. The County al. ees that the minin• activities associated with <br />extracting and transporting of this fill will not be charged a•ainst the limited <br />.uration of the inci.ental to constru i.n mining .ermit issued to the Develo.er <br />for the development. <br />G. The Developer agrees to furnish the County fill (not to exceed <br />110 010 cubic ards for use b the Count in the construction of 53rd treet east <br />of the Lateral H. Canal. The fill will be at no cost to the County but the County <br />RM: 7375391: 1 <br />i-9 <br />Page 6 of -1-616 <br />