My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/15/1984
CBCC
>
Meetings
>
1980's
>
1984
>
8/15/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:25 AM
Creation date
6/11/2015 4:44:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/15/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG 15 194 <br />BOOK 58 ;'nLIE 1 <br />D. Change Order 1 (Contract #1) - Elev. Storage Tank - SR 60 <br />The Board reviewed memo of the Utilities Service <br />Director, as follows: <br />TO: The Honorable Members of DATE: August 8, 1984 FILE: <br />the Board of County Commissioners <br />THRU.: Micha .W ight SUBJECT: CHANGE ORDER 1 ON CONTRACT #1 <br />Coun y inistrator FOR ELEVATED STORAGE TANK ON <br />ROUTE 60 (PROJECT U84) <br />FROM: Terrance G. PinREFERENCES: <br />Utility Service Di ector <br />DESCRIPTION AND CONDITIONS: <br />A) <br />Masteller Letter <br />7/12/84 <br />B) <br />Caldwell Letter <br />7/19/84 <br />C) <br />Masteller Letter <br />8/01/84 <br />D) <br />Contract Change <br />Order <br />A full time structural engineer inspector will no longer be required <br />due to a recent amendment to the law which removes the water tank <br />from the threshold category. Under the amended law, we are able to <br />utilize our consulting engineer for the project as inspectors of <br />the water tank; therefore, we will not be required to hire an <br />additional structural engineer inspector. <br />ALTERNATIVE AND ANALYSES: <br />1. A full time structural engineer inspector on the project. <br />2. A part-time structural engineer inspector on the project which <br />will offer a $13,800.00 deduction. <br />3. Completely eliminate the requirement for a full time structural <br />engineer inspector which will offer a deduction of $19,200.00. <br />Chairman Scurlock just wished to be assured that the <br />water tank can be constructed to meet all standards without <br />- the supervision of a structural engineer. <br />Administrator Wright noted that the tank is designed by <br />structural engineers, and Attorney Paull pointed out that <br />the end result still has to meet the same standards and an <br />engineer has to sign off on it. <br />ON MOTION by Commissioner Lyons, SECONDED <br />by Commissioner Wodtke, the Board unanimously <br />(4-0) approved Change Order #1 (Contract #1) <br />re the elevated storage tank on Route 60. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.