My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-063-63A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-063-63A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 8:39:34 AM
Creation date
11/10/2015 10:43:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Report
Approved Date
03/24/2015
Control Number
2015-063 / 2015-063A
Agenda Item Number
8.B.
Entity Name
Indian River County
Subject
Comprehensive Annual Financial Report
October 1, 2013 - September 30, 2014
Alternate Name
CAFR
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Long Term Financial Planning and Major Initiatives <br />Chapter 163 Florida Statutes and Florida Administrative Code Rule 9J-5 requires each local government <br />to have a Comprehensive Land Use Plan. An important part of this plan is the Capital Improvements <br />Program (CIP) which evaluates the need for public facilities in support of the Future Land Use Element, <br />to estimate the costs of improvements for which local government has fiscal responsibility, to analyze <br />the fiscal capacity of the local government to finance and construct improvements, and to adopt financial <br />policies to guide the funding and construction of the improvements. The CIP is updated annually and <br />encompasses a period of five years. Listed below are six major capital projects included in the current <br />CIP along with the source of funding and capital costs: <br />• Fire/EMS Station 13 - Construction of an additional station is necessary to serve the expanding <br />south county population. The Emergency Services District reserves will provide $1.7 million <br />with the remaining $850,000 being funded by impact fees. The operating expense will be <br />approximately $2.1 million. <br />• Osprey Marsh - The County is constructing the second algal turf scrubber (ATS) system called <br />the "Osprey Marsh" for the south relief canal. The ATS will remove dissolved nitrogen and <br />phosphorous from the water and return the treated water back to the Indian River lagoon where it <br />will enhance water quality and thereby support the resurgence of sea grasses in the lagoon. This <br />project is a collaborative effort between the Utilities Department and the Stormwater Division. It <br />is being funded through a combination of capacity charges, one cent sales tax and grants at an <br />estimated cost of $8.6 million. <br />• South County Park — Phase III Improvements - The expansion of this park is necessary to <br />provide recreation facilities and programs to the growing population in the southern part of the <br />County. A multi-purpose intergenerational facility will be constructed at a cost of $6.9 million <br />with impact fees and one cent sales tax providing the funding. Ad valorem tax proceeds and user <br />fees as well as partnering agency contributions will fund increased operating costs which are <br />estimated to be about $118,000 per year. <br />• 66th Avenue Widening — The widening of 66th Avenue from State Road 60 in Vero Beach to <br />49th Street is currently underway. This is one of the few main arterials connecting the north and <br />south county areas and traffic has increased substantially on this road. Construction costs are <br />over $20 million. Funding is from traffic impact fees, gas taxes and grants. In the future, the <br />County plans to expand 66th Avenue from 49th Street to the Sebastian City limits. <br />• CR 510 - 70th Avenue to Indian River — This roadway is scheduled for widening at an estimated <br />cost of $7.1 million for right of way and $21 million for construction. Traffic impact fees, <br />optional sales tax and gas taxes will provide the funding. <br />• Segment II Landfill Closure - Segment II of the landfill will reach capacity in FY 14-15. The <br />County has been accruing the cash on an annual basis to cover the estimated $4.5 million closure <br />costs. State and Federal regulations required that the Solid Waste Disposal District (SWDD) <br />provide funding for the closure and long-term maintenance costs of each segment of the landfill <br />as capacity is used. The SWDD user fees provide the funding source. Operating costs for the <br />new cell should remain about the same as for the current segment. <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.