My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-064
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2018 9:47:03 AM
Creation date
11/10/2015 1:32:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/24/2015
Control Number
2015-064
Agenda Item Number
8.D.
Entity Name
The Transit Group
Subject
Sector 3 Beach and Dune Restoration
Post Construction Biological Monitoring
Work Order #8
Area
Sector 3
Project Number
0928-A
Bid Number
2014037
Alternate Name
Ecological Associates, Inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Indian River County Sector 3 Sea Turtle Monitoring — 2015 <br />schedule aerial imagery collection during a period of optimal site conditions to <br />maximize data quality and allow concurrent in situ diver ground-truthing for <br />habitat verification. CSA will perform ground-truthing using bounce dives and/or <br />cross -shore video transects. Geo -referenced field positions will be included in <br />copies of the ground-truthing photography and/or transect video record to be <br />provided to the County and FDEP. <br />The aerial images obtained from the contractor will be digitized by CSA (as <br />needed) to produce GIS -based habitat maps (ESRI shape files) and facilitate <br />further analysis. CSA will use its ground-truthing to interpret the aerials used to <br />produce the GIS -based habitat maps. These maps will then be used by CSA to <br />assess post -construction hardbottom impacts (physical burial) likely attributable <br />to Phase 2B of the Sector 3 Project. <br />11) Post -Construction UMAM Analysis of Hardbottom Impacts. Based upon the <br />assessment of hardbottom impacts prepared under Task 8 and aerial imagery <br />interpretation in Task 9, CSA will conduct a Uniform Mitigation Assessment <br />Methodology (UMAM) analysis, pursuant to Chapter 62-345, F.A.C. The UMAM <br />analysis will include qualitative descriptions of impacted communities and <br />associated ecological functions, and quantitative estimates of the extent of <br />impacts. CSA will confer with FDEP staff during and upon completion of the <br />UMAM analysis to access any actual hardbottom impacts or the absence of <br />impacts potentially attributable to the Project. <br />12) Summary Spreadsheet of Sea Turtle Nesting Activity (FDEP Specific Condition <br />No. 29). At the end of the 2015 nesting season, an Excel spreadsheet of all nesting <br />activity and reproductive success will be prepared and submitted electronically to <br />FDEP and FWC. Data will be reported separately for each phase of the Sector 3 <br />Project and the control beach. <br />13) Final Interpretive Report. Upon conclusion of sea turtle data analyses for the <br />2015 nesting season, a draft interpretive report, including an assessment of project <br />impacts, if any, will be submitted to the County. This assessment will be based on <br />statistical and other comparisons of nesting and reproductive success data <br />between treatment and control areas. EAI will meet with the County to review and <br />identify any changes warranted in the interpretive report. After such changes are <br />made by EAI, a final report will be prepared and submitted to the County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.