Laserfiche WebLink
operated and maintained in a manner compatible with prescribed burning practices. The Park Manager or his/her designee will <br />notify the County pnor to any prescribed fire activity on the Park and will limit all temporary closures to the minimum duration <br />possible to assure public safety. <br />E. County agrees to cooperate fully with the Park Manager or his/her designee to ensure that the maintenance and <br />use of the facility does not prevent or adversely affect the Park's ability to conduct prescribed fires. This includes , but may not <br />limited to, all measures necessary to maximize safety such as assisting with posting and maintaining of smoke signage, <br />complying with and assisting with traffic control and assisting with possible temporary closure of the Park to pedestnan and <br />vehicular traffic <br />F. County or County's representative will coordinate all construction and maintenance activities with the Park <br />Manager or his/her designee, at least seven (7) days in advance. At the discretion of the Park Manager or his/her designee, such <br />coordination may require an on-site meeting. The Park Manager may be contacted at (321) 953-5004. <br />G. County acknowledges that the Park Manager has the authority to temporarily halt any construction or <br />maintenance activities that he/she determines -using his/her professional opinion -are unsafe for Park visitors or staff or <br />unacceptably adversely impacting Park resources or facilities. In such work stoppage the Park Manager or his/her designee will <br />work in earnest to identify and implement a resolution as quickly as possible, so as not to cause unnecessary delays to County's <br />schedule of operation. <br />H. County will pay reasonable maintenance, repair or replacement costs incurred by the DRP if such costs are <br />mutually determined by the DRP and County to be a result of this proposed use. Any repair or replacement of Park resources <br />will be done at the sole expense of the County to the satisfaction of the Park Manager or his/her designee. <br />I. County will install gates at the boundaries of the Park so that DRP personnel can close the trail to public use <br />for safety purposes, such as dunng prescribed burning activities on the Park. <br />J County will install removable bollards along the trail at each location where a vehicular roadway/dnveway <br />crosses the trail. The bollards will exclude motonzed vehicles but will be incompliance with the ADA. <br />K. It is understood that the Florida Department of Transportation intends to construct the Trail on behalf of the <br />County/Grantee within the Easement Area. <br />L. Upon completion of construction of the recreational Trail, County/Grantee shall be fully responsible for the <br />maintenance of the improvements. <br />Page 6 of 11 <br />Easement No. 32851 R 04/15 <br />