My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/24/1984
CBCC
>
Meetings
>
1980's
>
1984
>
10/24/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:26 AM
Creation date
6/11/2015 4:52:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/24/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. IRC Bid #222 - (1) Single Man Aerial Lift <br />The Board reviewed the following memo dated 10/8/84: <br />TO: Board of County Commissioners DATE: October 8, 1984 FILE: <br />i <br />THRU: Michael Wright SUBJECT: IRC BID #222 - (1) Single Man <br />County Administrator Aerial Lift <br />FROM: ��u �,� ���'�,REFERENCES: <br />Carolyn(600drich, Manager <br />Purchas'hg Department <br />1. Description and Conditions <br />Bids were received October 1, 1984 at 11:00 A.M. for IRC #222 - (1) Single <br />Man Aerial Lift for the Traffic Engineering Department. <br />20 Bid Proposals were sent out. Of the 6 Proposals received, 2 were No Bids". <br />2. Alternatives and Analysis <br />The low bid for the single man aerial lift was submitted by Hobbs Equipment Co., <br />West Palm Beach, F1. in the amount of $14,995.00. The bid meets all specifications. <br />Adding the optional Hammer drill and chain saw would put the total over the <br />$15,000.00 budgeted. <br />3. Recommendation and Funding <br />It is recommended that IRC #222 be awarded to the low bidder, Hobbs Equipment, for <br />the aerial lift without options. <br />Delivery 60 - 75 days after receipt of Purchase Order. <br />There is $15,000.00 budgeted in Account #111-245-541-66-42. <br />Commissioner Wodtke noticed that there is only a $355 <br />difference in the bids received from the Sebastian firm and the <br />West Palm Beach firm. <br />Administrator Wright advised that was taken into <br />consideration, but the West Palm Beach firm was the lowest <br />bidder, but Traffic Engineer Mike Orr considered the lift from <br />Hobbs superior to the lift from Sebastian. <br />3 <br />OCT 24 1984 600K 58 FAucr. "u-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.