My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/15/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
09/15/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2024 1:46:33 PM
Creation date
11/23/2015 11:55:16 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/15/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: <br />THROUGH: <br />FROM: <br />SUBJECT: <br />Joseph A. Baird, <br />County Administrator <br />Christopher R. Mora, P.E. <br />Public Works Director <br />James D. Gray, Jr. <br />Coastal Engineer <br />CONSENT AGEND <br />Release of Retainage for CB&l Coastal Planning and Engineering, Inc <br />Work Order No. 7 <br />Sector 3 Dune Repair Project — Construction Phase Services <br />DATE: September 3, 2015 <br />DESCRIPTION AND CONDITIONS <br />On March 19, 2013 the Board approved a contract with CB&I Coastal Planning and Engineering, <br />Inc. (CB&I) for professional coastal engineering services in Indian River County for a two-year <br />term, 2013-2015. On March 17, 2015 the Board renewed the contract until March 19, 2017. <br />CB&I is the selected County consultant for professional engineering services related to the Sector <br />3 Dune Repair Project. <br />Work Order No. 7 to this contract provided for construction phase services related to Sector 3 <br />Dune Repair Project. The Board approved Work Order No. 7 lump sum amount was $57,319 and <br />included 7 separate tasks. To date all tasks are 100% complete. The total amount of retainage <br />withheld under Work Order No. 7 is $5,731.90. <br />CPE is requesting the release of all withheld retainage in the amount of $5,731.90. <br />FUNDING <br />Local funding of Beach Restoration includes a portion of Local Option Tourist Tax Revenue as <br />well as allocation of the One Cent Sales Tax. Funding for the release of retainage is from <br />Account # 128-206000-13014. <br />F \Public Works\JamesG\Sector 3 Repair Project\CPE Work Orders\Work Order No. 7\Agenda Item\Retainage <br />Release\FINAL memo agenda - retainage release CPE Work Order 7.docx <br />181 <br />
The URL can be used to link to this page
Your browser does not support the video tag.