Laserfiche WebLink
K-j <br /> INDIAN RIVER COUNTY, FLORIDA <br /> DEPARTMENT OF UTILITY SERVICES <br /> I <br /> Date: September 16, 2015 <br /> I <br /> To: Joseph A. Baird, County Administrator <br /> i <br /> From: Vincent Burke, P.E., Director of Utility Service <br /> Prepared By: Arjuna Weragoda, P.E., Capital Projects Manager Aw <br /> 1 <br /> Gordon Sparks, P.E., Environmental Engineer ellfj <br /> Subject: Approval of Work Authorization No. 2015-002 to Replace Corroded <br /> Galvanized Water Main and Water Services in Vista Royale, Phase 2 <br /> UCP#4120 <br /> DESCRIPTIONS AND CONDITIONS: <br /> Over the past six years the Department of Utilities Services Operations group has been called to Vista <br /> Royale for emergency repair to galvanized water main and water service breaks. An examination of the <br /> old galvanized pipe built in 1973 revealed that severe corrosion has weakened the walls of the pipe <br /> causing numerous pipe breaks. Operations personnel have concluded it is prudent to replace the old <br /> galvanized pipe to reduce and/or eliminate water main breaks and interruption of service to its <br /> customers. The area currently with the most breaks is on Pine Arbor Lane. This area was selected as the <br /> second phase of pipe replacement. <br /> ANALYSIS: <br /> I <br /> Staff decided the most efficient and timely method to replace the deteriorated pipe was to utilize the <br /> Department of Utilities Services Labor Contractor, Blue Goose Construction. A list of the anticipated labor <br /> and materials quantities was prepared and bid prices from Blue Goose Construction were used to <br /> determine the costs for labor. The total labor cost estimate for Blue Goose Construction is $66,000.99 <br /> (See Attachment 1). The total material cost estimate is $15,211.33. The total project cost estimate is, <br /> therefore, $81,212.32. <br /> FUNDING: <br /> Funding for this project is derived from the 2015-2016 R&R budget in the Operating fund. The Operating <br /> fund budget is derived from water and sewer revenues. <br /> ACCOUNT NAME ACCOUNT NUMBER AMOUNT <br /> Utility R& R Fund 47123536-044699-15514 $81,212.32 <br /> Utilities/Utilities Engineering/IRC—Vista Royal Galvanized WM and Services Replacement,Phase 2 S <br /> 86 `. <br />