My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/06/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
10/06/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2018 4:09:09 PM
Creation date
11/24/2015 11:20:45 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/06/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA � <br /> DEPARTMENT OF UTILITY SERVICES <br /> F7 fltttt>� <br /> Date: September 25, 2015 <br /> To: Joseph A. Baird, County Administrator <br /> From: Vincent Burke, P.E., Director of Utility Servic <br /> Prepared By: Gordon Sparks, P.E., Environmental Engineer rE 5 <br /> Arjuna Weragoda, P.E., Capital Projects Manager i��i✓� <br /> Subject: Final Payment to Blue Goose Construction for Replacement of 3" Galvanized <br /> Water Main and Services in Vista Royale, Phase 1 —UCP#4113 <br /> DESCRIPTIONS AND CONDITIONS: <br /> On March 3, 2015 the Board of County Commissioners (BCC) approved Work Authorization No. 2015-001 <br /> to Blue Goose Construction in an amount of $71,129.18 to construct a 4" water main to replace a 3" <br /> galvanized water main and replace 2" galvanized water services with PE pipe. <br /> ANALYSIS: <br /> Application for Final Payment for $71,442.93 was received on September 23, 2015 for total cost of the <br /> labor for the project. This is $313.75 more than approved for the construction. The overrun on the <br /> original amount was due to the fact that additional 4" HDPE directional bore pipe was required to be <br /> installed.The project is now complete and has been placed into service. <br /> FUNDING: <br /> Funding for the project is derived from the R & R budget in the operating fund. Operating fund revenues <br /> are generated from water and sewer sales. <br /> ACCOUNT NAME ACCOUNT NUMBER= AMOUNT <br /> Vista Royale Line Replacement 47123536-044699-155141 $71,442.93 <br /> Page 1 of 2 <br /> 171 <br />
The URL can be used to link to this page
Your browser does not support the video tag.