My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/06/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
10/06/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2018 4:09:09 PM
Creation date
11/24/2015 11:20:45 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/06/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> BRIDGE DESIGN ASSOCIATES,INC. <br /> 43RD AVENUE OVER SOUTH RELIEF CANAL <br /> BRIDGE RAILING REPAIR <br /> September 11,2015 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT W <br /> PROJECT PROJECT FIELD REP CAD TOTAL LABOR <br /> TTVFMG;ER ENORMER El TECHNICIAN HOURS COST <br /> � � MIABY BY <br /> ACTIVITY AC7MTY <br /> $185A0 582.00 580.00 (83.00 <br /> Coordinetim Meetinp 4.0 4.0 $740.00 <br /> Site Visit 5A 5.0 10.0 5680.00 <br /> peop&Detaillm 2.0 6.0 6.0 24.0 38D $3,834.00 <br /> Plena&DeteU6 4A 8A 12.0 $1,476.00 <br /> Peffnftbng ADWimbon 2.0 4.0 4.0 6.0 16.0 $1,816.00 <br /> TOTAL NIANHOURS 12D 23D 15.0 30.0 80.0 <br /> DIRECT LABOR COST $2.220.0D $2,116.00 51=00 $2.780.00 58,328.00 <br /> 18,328.00 <br /> S12015-Jo \-Plgm ts143td over 5 ROM Cam rsW*V Aftk WMPoselslEsfifCB A 08-11-1 Sada <br /> 184 <br />
The URL can be used to link to this page
Your browser does not support the video tag.