My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-064A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-064A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 8:41:43 AM
Creation date
12/2/2015 2:23:58 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/24/2015
Control Number
2015-064A
Agenda Item Number
8.E.
Entity Name
Florida Inland Navigation District
Subject
Archie Smith Fish House
Boardwalk, Dock Restoration
Cost Share Grants
Area
Round Island Riverside Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br />entity. The governmental entity that owns the project site may be joined as a co -applicant to meet this property control requirement. <br />Existing land based development projects that are being repaired, replaced or modified must demonstrate that the project site has <br />been dedicated for public use for at least 25 years with at least 10 years remaining on the dedication document. Property shall also <br />be deemed dedicated for public use if: <br />(a) The property has been designated for the use for which the project is intended (even though there may have been no formal <br />dedication) in a plat or map recorded prior to 1940, or <br />(b) The project sponsor demonstrates that it has had exclusive control over the property for the public use for which the project <br />is intended for a period of at least 30 years prior to submission of the application, or <br />(c) There is no ongoing litigation challenging the designated use of the property as shown on the plat or map, nor has there been <br />any judicial determination contrary to the use by the public for the use shown on the plat or map. <br />(3) Permits: The project sponsor is responsible for obtaining and abiding by any and all federal, state and local permits, laws, <br />proprietary authorizations and regulations in the development and operation of the project. Applicants for construction projects that <br />include elements that require state or federal environmental permits or proprietary authorizations will demonstrate that all required <br />environmental permitting and authorizations will be completed by the District's final TRIM hearing. This demonstration will be by <br />submission of the required environmental permit(s) and authorizations, or by submission of a letter from the agency(s) stating that a <br />permit or authorization is not required. Should the environmental permitting element of an application that has construction elements <br />requiring state or federal environmental permits or authorizations not be completed by the District's final TRIM hearing, the <br />construction portion of the project will not be considered for funding. Whereby funding decisions are completed at the final TRIM <br />hearing, the District will not deviate from the funding schedule to accommodate any application deficiency. <br />(4) Public Marina Qualifications: All public marina projects funded through this program shall include sewage pumpout <br />facilities for vessels, unless the applicant can demonstrate that inclusion of such a facility is physically, operationally or <br />economically impracticable. All public marina projects funded through this program shall have at least ten percent (10%) of their <br />slips or mooring areas available for transient vessels. Public marina dockage rates shall be within market comparison of the dockage <br />rates of other area marinas. The public marina will be required to establish and maintain an accounting of the funds for the facility <br />and shall plan for and retain at all times sufficient funds for the on-going maintenance of the facility during its project life. <br />(5) The District may assist eligible local governments with efforts to prepare and implement a comprehensive maritime <br />management plan. The plan shall be utilized by the eligible government to promote and maximize the public benefit and enjoyment <br />of eligible waterways, while Identifying and prioritizing the waterway access needs of the community. The plan should not duplicate <br />any existing or ongoing efforts for the same waterway or water shed, nor shall the District participate in any effort that does not <br />address the basic maritime needs of the community. <br />(a) Existing plans may be updated at reasonable intervals or amended to include waterway areas previously not included in the <br />original effort. Public, government, environmental, industry and other pertinent interest groups shall be solicited and included for <br />input in the planning process. <br />(b) The plan shall be utilized as a tool to provide a minimum 5 -year planning analysis and forecast for the maritime needs of the <br />community, and shall include, at minimum, the following: <br />1. Public boat ramp and ramp parking inventory and analysis. <br />2. Public mooring and docking facility analysis, including day docks and transient slips. <br />3. Commercial and working waterfront identification and needs analysis. <br />4. The identification, location, condition and analysis of existing and potential navigation channels. <br />5. An inventory and assessment of accessible public shorelines. <br />6. Public Waterway transportation needs. <br />7. Environmental conditions that affect boat facility siting, a current resource inventory survey, and restoration opportunities. <br />8. Economic conditions affecting the boating community and boating facilities. <br />9. Acknowledgment and coordination with existing data and information, including an emphasis on the Intracoastal Waterway. <br />(c) Projects requested for assistance program funding shall be consistent with the applicant's maritime management plan. The <br />applicant should utilize the plan to assist in prioritizing waterway improvement projects. <br />(6) All eligible environmental restoration, enhancement or mitigation projects as well as the environmental restoration, <br />enhancement or mitigation components of other types of projects shall be required to pursue and assign any available mitigation <br />
The URL can be used to link to this page
Your browser does not support the video tag.