My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/2/1985
CBCC
>
Meetings
>
1980's
>
1985
>
1/2/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:11 AM
Creation date
6/12/2015 10:03:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/02/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROUTE 60 WATERLINE PROJECT - ENGINEERING CONTRACT, CHANGE ORDER <br />NO. 2 <br />The Board reviewed staff memo, as follows: <br />TO: The Honorable Members of DATE: <br />The Board of County Commissioners <br />i <br />December 20, 1984 FILE: <br />THRU: Terrance G.l iYYCo SUBJECT: CHANGE ORDER NO. 2 IN THE AMOUNT <br />Utility Service Director OF 5,100 FOR ENGINEERING CONTRACT <br />ON THE ROUTE 60 WATERLINE PROJECT <br />FROM: Jose A. Baird REFERENCES: <br />Assistant Utility Director <br />DESCRIPTION AND CONDITIONS: <br />Future plans of the County for road improvements in the vicinity <br />of Kings Highway north of Route 60 have encouraged the Utility <br />Department to consider extending the 20" water main from the corner <br />of Route 60 and Kings Highway, 1500 feet north on Kings Highway. <br />If the work is permitted and constructed before the new road improve- <br />ments are done, it would save the Utility Department a considerable <br />amount of money. <br />The engineering design and resident inspection to extend the 20" <br />water main 1500 feet will increase their contract price an additional <br />$5,100. <br />ALTERNATIVE AND ANALYSES: <br />1. Disallow the engineering design and resident inspection cost to <br />extend the waterline 1500 feet. <br />2. Allow the engineering design and resident inspection costs for <br />extending the waterline 1500 feet. <br />RECOMMENDATION: <br />We recommend Change Order No. 2. <br />ON MOTION by Commissioner Scurlock, SECONDED <br />by Commissioner Wodtke, the Board unanimously <br />approved Change Order #2, Project U84-1, Sippel, <br />Masteller, Lorenz & Hoover (Engineering) in the <br />amount of $5,100. <br />MWO <br />JAN 2 1995 <br />L_ <br />BOOK F'CE� <br />
The URL can be used to link to this page
Your browser does not support the video tag.