My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/6/1985
CBCC
>
Meetings
>
1980's
>
1985
>
3/6/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:12 AM
Creation date
6/12/2015 10:13:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/06/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ® s <br />Wastewater Plant <br />1. A large diesel operated generator is located near the waste- <br />water plant. The generator serves the water and wastewater plant <br />during power outages. Mr. Stalvey started the generator during <br />--the inspection. <br />2. There is one lift station and the following was noted: <br />a. Lift station rises above ground approximately.four feet <br />-and has a metal lid. <br />b. The station appears to be constructed of storm sewer pipe. <br />'"c. The check valves are located within the lift station wet - <br />well instead of within a separate valve box. A sewer line <br />from the laundromat dumps was tew ter on top of the valves. <br />.. C1��- -�e� :.a•Gw�d�J � Q�re:a�c�-w`u a�� t�aPjo..e-�(, <br />'d. The station has two submersible pumps hat are operated <br />by a bubbler switch system. <br />e. The force main has a single valve located outside of the <br />lift station.- The valve is frozen <br />-hand-inoperati e <br />f. There are no provisions for em6rgec`ncncydJpumping of the lift <br />station in the event of pu�m�lure. ., <br />k�n2o� 4iv� <br />g. An emergency generator is located aaj scent to the lift <br />station to provide operation during -power outages. <br />3. The wastewater treatment plant was nat in operation due to <br />the extremely low flows (Only one residence is occupied). <br />4. The filter media needs to be reworked because charcoal powder <br />was mistakenly placed in the filter instead of granular charcoal. <br />The powdered charcoal must be removed. <br />5. The water level within the percolation ponds is very low since <br />they are not in use and the vegetation within the ponds has recently <br />been cut down and removed. <br />6. The general appearance of the wastewater plant is satisfactory. <br />7. Mr. Stalvey placed the plant in operation during the inspection <br />and all units of the plant operated satisfactorily. <br />The Chairman asked if anyone present wished to be heard. <br />There were none. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Bird, the Board unanimously (4-0) closed <br />the public hearing. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Bird, the Board unanimously (4-0) adopted <br />Res. 85-27 authorizing a transfer of the sewer and water <br />franchise granted to Gulf & Western Food Products. <br />63 <br />MAR 6 1985 <br />BOOK U PnF 104 <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.