Laserfiche WebLink
With the Magnetic meter the present pit can be utilized. <br />The amount of piping required will be minimal and will <br />consist of reducing the 6" force main to a 3" 20' a- <br />head and beyond the pit. It is suggested that a by- <br />pass be provided so service can continue if the meter <br />needs to be pulled. <br />The price of the equipment has been quoted at less than <br />$6,000.00 complete. Installation should be about <br />$1,500.00 or $7,500.00 total. <br />The manufacturer representative has agreed on an annual <br />service contract of'$1,500.00 to service and calibrate <br />the meter four (4) times annually. Lloyd & Associates, <br />Inc. will provide the specifications, drawings, en- <br />gineering, installation supervision and start up on an <br />hourly basis with a not to exceed $2,000.00. <br />Your early response concerning the above will be <br />appreciated, and if you have any questions, please <br />feel free to contact me. <br />Sincer , <br />e t' Lloy , .E. <br />President <br />Director Pinto stressed the importance of having an accurate <br />meter, particularly now that we have the Ixora and Treasure Coast <br />sewerage running into the City plant. He assured the Board that <br />the proposed meter will handle the maximum capacity of the Sixth <br />Avenue line. <br />Commissioner Bird asked if staff felt the engineering fees <br />were reasonable, and Director Pinto stated that one of the <br />problems is that while this is a small project, it has taken <br />considerable time. Staff requested that this be thoroughly <br />checked out because we did not want just to accept the word of <br />the vendor. He noted that the meter has a year's warranty and a <br />service contract as well as guaranties and further pointed out <br />that it is desirable to have the same type of meter the City <br />presently uses because of the servicing. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />the proposal of Lloyd & Assoc. for metering wastewater <br />going into the City of Vero Beach Treatment Plant per <br />their letter dated February 22, 1985. <br />17 <br />MAR 2 0 1995 600 ® Fa,ctq� <br />I <br />