Laserfiche WebLink
forms and actually won't have an idea how accurate this <br />information is until the inspections are completed. We are only <br />required to inspect 20% this year. <br />5) Staff has identified two preliminary sites for storage and <br />transfer station only. <br />Mr. Brooks noted that the hazardous waste cannot just be <br />picked up and moved; the waste must be analyzed, properly <br />contained, manifested, and transported by an authorized agency. <br />All this is under very strict control. <br />In further discussion, Mr. Brooks explained that the two <br />sites identified will not automatically become transfer stations; <br />we are only required to designate sites so they will be available <br />when and if the need arises. Mr. Brooks felt that at this point <br />in time, it is doubtful such a station would be needed as there <br />is at least one station in the southeast part of the state which <br />could probably handle most of the waste generated in this general <br />area. <br />Chairman Lyons felt we actually do have a need for such a <br />station. He noted that he has disposed of excess paint, <br />insecticides, etc., just by putting them in the garbage, but we <br />want to -stop that in the long run. To do so, we will need a <br />place for people to leave these kind of things. He felt we have <br />to go about changing our habits, and we need to set up something <br />to make it possible for us to change them. <br />Commissioner Bird asked if it is the waste generator's <br />responsibility to transport the waste to the transfer site, and <br />Mr. Brooks stated that it is his responsibility to see that it is <br />properly disposed of. He then displayed slides of the transfer <br />station located at Pompano Beach, a very simple type building <br />with a trailer serving as the office area. Mr. Brooks reported <br />that a television camera monitors the people coming in, and there <br />are safety devices in the building, emergency showers, etc. The <br />concrete floor is elevated so that any leakage would flow to the <br />rear of the building to catch basins, which are located outside <br />57 BOOK PArF2 <br />APR 3 1985 <br />