My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/17/1985
CBCC
>
Meetings
>
1980's
>
1985
>
4/17/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:12 AM
Creation date
6/12/2015 10:19:57 AM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q'e <br />BOOK <br />CHANGEDistill)LI11 <br />11 M' <br />ORDER <br />0VVNLR <br />U <br />ARCHITECT <br />❑ <br />AIA DOCUMENT 6701 <br />CON I RACTOR <br />❑ <br />iIF1U <br />C1 <br />01Ifi:R <br />❑ <br />PROJECT: 16th Street <br />Paving <br />$ Drainage <br />CHANGL ORDER NUMBER: <br />8416-1 <br />(name, address) from 51st <br />Court to Kings Highway <br />INITIATION DATE:Apr. 8, <br />198.5 <br />TO (Contractor): <br />FDennENGINEER <br />PROJECT NO: <br />8416 <br />L. <br />P.O. Box <br />Smith, <br />2954 <br />Inc <br />CONTRACT FOR: Paving <br />and Drainage <br />Vero Beach, <br />F1. <br />32960 <br />Improvements to 16th St. <br />I CONTRACT DATE: <br />You are directed to make the iollowing changes in this Contract: <br />Alternate Item B. - Removal of Australian Pines from Sta. 23+40 <br />to Sta, 29+00 <br />Decrease Contract price for item B by $4,930 from $17,780 to <br />$12,850 due to County hauling and disposing of Australian Pines <br />with Road and Bridge Department labor and equipment. <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adlustment in the Contract Sum or Contract Time <br />The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... $ 115, 236. 15 <br />Net change by previously authorized Change Orders ................................... $ -0- <br />The <br />0 -The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... S 115,236.15 <br />The (Contract Sum) will be amoeitesxda (decreased) (omJKat%eck <br />by this Change Order......................................................... S 4 930.00 <br />The new (Contract Sum) including including this Change Order will be ... S 110, 306.15 <br />The Contract Time will be (*xwxsetlbl AeCXel *id) (unchanged) by ( 0 ) Days. <br />The Date of Substantial Completion as of the daze of this Change Order therefore is 70 calendar days <br />ENGINEER: Authorized: <br />James W. Davis P.E. Dennis L. Smith, Inc Patrick B. Ly ons.Chairman <br />Indian. i.ver Comty CONTRAC-IOR ('Ndlan River County <br />1Rdff 2Sth_Street P.0- Box 2954 <br />Address Address A e ree <br />Vero Beach, Fl. 32960 Ver Yeach, Fl. 32260 <br />DAIS 7—I %' o5 - — --MATE, % r/O —(J� ,--- U E =/ /—/7 S•— <br />AIA DOCUMENT G'01 • <HA%(A oXIAk • ♦eeil Ivan 1Uttu)t. • •+Il" • iv i. <br />THE AWRICAN INS111UIE Ut AklH11k( 15, I: j, Nttr tukk 4\t . N N wASWISLAON, U% LUipe. 6701 — 1978 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.