Laserfiche WebLink
APR 1-7 1985 <br />poor C 6 c 611 <br />SCHEDULE "A" <br />INDIAN RIVER COUNTY PROJECT U84-1/CONTRACT ##1 <br />750,000 GALLON ELEVATED WATER STORAGE TANK <br />UNCOMPLETED WORK <br />Contract <br />Description of <br />Quantity <br />Engineer's <br />Item <br />Uncompleted Item <br />Uncompleted <br />Unit Price <br />Estimate of Cost <br />6) <br />Site Improvement & <br />25% <br />$ 17,000.00 <br />$ <br />4,250.00 <br />Restoration <br />7) <br />750,000 Gal Elevated <br />Storage Tank <br />b) Fabricated Materials <br />15% <br />$271,769.00 <br />$ <br />40,765.35 <br />c) Field Erection <br />55% <br />$182,745.00 <br />$ <br />100,509.75 <br />d) Electrical <br />100% <br />$ 10,000.00 <br />$ <br />10,000.00 <br />8) <br />Preparation & <br />100% <br />$ 65,000.00 <br />$ <br />65,000.00 <br />Painting <br />9) <br />CO #f2 dated 10/26/84 <br />100% <br />$ 6,384.00 <br />$ <br />6,384.00 <br />(Tank Interior Floor Slab) <br />Retainage ................................................$ <br />36,744.20 <br />Total Uncompleted Work ................................. <br />.$ <br />263,653.30 <br />