My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/8/1985
CBCC
>
Meetings
>
1980's
>
1985
>
5/8/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:13 AM
Creation date
6/12/2015 10:23:05 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/08/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-I <br />MAY 8 1985 BOOK 60 P{,,,E 857 <br />DISCUSSION RE INTERIM CONTROL LINE <br />Ellie Van Os, Conservation Chairman of the Pelican Island <br />Audubon Society, read aloud the following letter dated May 1, <br />1985: <br />PELICAN ISLAND AUDUBON SOCIETY <br />P. 0. Box 1833 <br />VERO BEACH, FLORIDA 32960 <br />!..4 '' May 8, 1985 <br />Indian River County Board of County Commissioners <br />1840 25th St. <br />Vero Beach, FL 32960 <br />Dear Board Members, <br />It is the will of the Conservation Committee of the Pelican Island <br />Audubon Society to request that the County Commission ask the State Department <br />of Natural Resources to devel.op an Interim Control Line for Indian River County. <br />The Coastal Construction Setback Line was last delineated in 1974 (according to the <br />Status Overview of Indian River County). In the late seventies, the state <br />charged DNR with restudying that line every five years, but the usual reasons <br />including manpower, have pushed the next scheduled review to September of 1986, a <br />date described as optimistic. <br />The Interim Control Line would be based on the "landward limit of the <br />impact zone of a 100 -year storm event", the same criteria that would be used <br />to describe the new Coastal Construction Control Line in 1986. To picture this <br />line, when a wave breaks even on a calm summer day there is an obvious trough <br />where the maximum energy of the wave impacts the shoreline; beyond that the <br />wave flattens as it reaches farther up the beach. In this case, the Interim Control Line <br />is the landward limit of that impact zone for a 100 -year storm event and does not <br />necessarily delineate where the wave would actually stop. <br />You may ask the relationship between the Thanksgiving storm and the <br />Interim Control Line. As it was described to me by Paden Woodruff with the <br />Division of Beaches and Shores in theDepartment of Natural Resources in <br />Tallahassee, the Thanksgiving.storm was not a 100 -year storm event. In all <br />respects it was a typical northeastern storm, their duration being notably longer <br />than hurricane events and as such the erosive damage of four northeastern <br />storms can often exceed that of a hurricane. However, because of the extensive <br />damage caused by the storm, many surveys were made in its aftermath. The <br />Department has an array of historical profiles and survey information that <br />coupled with these most recent surveys would be utilized to determine the <br />alignment. <br />Mr. Woodruff also made a point to distinquish between what were formerly <br />called setback lines and are now called control lines. Setback denotes a line <br />of prohibition, but what the State intends with a control line is that instead <br />of the State prohibiting development seaward of the line (an option left open to <br />the local governing body), they primarily insist on -compliance with Coastal <br />Construction Standards, hence the need for state review. <br />62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.