My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/5/1985
CBCC
>
Meetings
>
1980's
>
1985
>
6/5/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:13 AM
Creation date
6/12/2015 10:27:57 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/05/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Terry requested the Board to consider approving the <br />paving of the portion of roadway between 19th Ave. S.W. and 18th <br />Ave. S.W. Right now 18th Ave. generates a lot of bus traffic to <br />the Thompson Elementary School; 14th St. S.W. is a paved <br />surface, and the only portion that would be left unpaved is that <br />strip just north of Kelly Road (13th St. S.W.). <br />Public Works Director Davis clarified that what Ms. Terry is <br />referring to is a very short section of roadway which would link <br />two paved roadways and actually is more of a maintenance item. A <br />tremendous amount of traffic generated from the Oslo Park area <br />travels on 14th St. S.W. which was paved about three years ago, <br />and this would provide a continuous link from 27th Ave, to Oslo <br />Road to serve all of Oslo Park Subdivision. This would involve <br />about 200' of roadway and would be funded with funds from the <br />Road and Bridge account. <br />In discussion, it was agreed this was worthwhile and that it <br />should be dealt with by a separate Motion. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Bowman, the Board unanimously adopted Res. <br />85-58, providing for the paving and drainage improve- <br />ments for Project #8402 (19th Ave. S.W. between 13th and <br />14th Sts. S.W.); approved the preliminary assessment <br />roll, the interest to be 1% over the Prime Rate at the <br />time the final assessment roll is approved; allocated <br />$16,340.41 from the Petition Paving Account for this work; <br />and notified Road & Bridge to schedule construction. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Bowman, the Board unanimously authorized Road <br />8 Bridge to pave the portion of roadway between 19th Ave. <br />S.W. and 18th Ave. S.W. as recommended by the Public Works <br />Director, funding to be from the Road S Bridge account. <br />67 <br />JUN 5 1985 aor U F� a �1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.