Laserfiche WebLink
L- JUN <br />M <br />50,000 gallons per day or less utilizing contact stabilization mode <br />for treatment are prohibited. <br />(C) All wastewater treatment plants shall have surge <br />control equaling 20% of the design capacity of the plant. <br />SECTION 3. <br />FLOW MEASUREMENT <br />All wastewater treatment plants located on Orchid Island <br />shall have a flow measuring device which will provide a record of <br />diurnal flow changes as well as total daily flows. <br />SECTION 4. <br />MONITORING REQUIREMENTS <br />All wastewater treatment plants located on Orchid Island <br />shall comply with the provisions of Florida Administrative Code <br />Chapter 17-19, but shall, as a mimimum, monitor for biochemical- <br />oxygen <br />iochemicaloxygen demand and total suspended solids within the effluent <br />through analysis of no less than one representative grab sample of <br />the effluent per week. This monitoring requirement is a minimum <br />and applies to all wastewater treatment plants regardless of size. <br />Where additional or more stringent monitoring is required under the <br />Florida Administrative Code, Chapter 17-19, or by the Indian River <br />County Division of Utility Services or the Florida Department of <br />Environmental Regulation, the additional or more stringent <br />monitoring shall be performed. <br />SECTION 5. <br />TIME LIMITATIONS <br />Existing wastewater. treatment plants located on Orchid <br />Island shall comply with <br />Sections 2 through 5 of this ordinance <br />within the following described deadlines: <br />(A) Compliance <br />with the effluent limits and design <br />capacity requirements shall <br />be accomplished within 180 days from <br />the effective date of this <br />ordinance. <br />(B) Compliance <br />with the surge control and flow <br />measurement requirements <br />shall be accomplished within 90 days from <br />the effective date of this <br />ordinance. <br />(c) Compliance <br />with the monitoring requirements shall be <br />accomplished within 60 <br />days from the effective date of this <br />ordinance.) <br />77 <br />5 1985 <br />Boas A FIMI.; �. � <br />