My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/12/1985
CBCC
>
Meetings
>
1980's
>
1985
>
6/12/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:13 AM
Creation date
6/12/2015 10:28:42 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/12/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: The Honorable Members of DATE: June 4, 1985 FILE: <br />The Board of County Commissioners <br />THROUGH: <br />Michael Wright, <br />County Administrator <br />James W. Davis, P.E.(:V <br />10Public Works Director <br />FROM: Donald G. Finney .' <br />Parks Engineering Toth <br />DESCRIPTION <br />SUBJECT: Award of Bid - Sand Replenishment <br />Wabasso Beach Park and <br />Tracking Station Park <br />REFERENCES: <br />ian <br />The Board of County Commissioners approved $35,800 to replace 4475 cubic <br />yards of sand and in-house planting of sea oats on the entire length of <br />dunes at Wabasso Beach and Tracking Station Parks to protect the dune and <br />walkover structures. <br />Three bid packages were picked up thru advertising for bids. One sealed <br />bid was received from Saw Mill Ridge as follows: <br />Wabasso Beach Park <br />Deliver and unload 1645'cubic yards $ 4359.25 <br />Tracking Station Park <br />Deliver and unload 2830 cubic yards $ 8490.00 <br />12849.25 <br />Performance Bond $ 520.00 <br />13,369.25 <br />(original Estimate $13,500) <br />The County Road and Bridge Department estimate is $5.50 per cubic yard - <br />$24,613. This is more than the Saw Mill Ridge price of $2.87 per cubic <br />yard because the County trucks are of smaller capacity requiring more trips <br />to and from the Hobart Sand pit. ' <br />ALTERNATIVES AND ANALYSIS <br />If'Saw Mill Ridge is awarded the contract, a savings of $10,.724. would <br />result over in-house work with smaller trucks. <br />The sand obtained from Saw Mill Ridge is compatable with the existing beach <br />sand and the contract involves only transportation and dumping of sand. <br />The placement will be by the County Road $ Bridge Department. <br />RECOMMENDATION AND FUNDING <br />It is recommended that the bid be awarded to Saw Mill Ridge in the amount <br />of $12,849.25 and that the performance bond.be.:waivd. Funding to'be <br />from Account # 001-199-581-99.91 General Contingengy Fund <br />13 BOOK F''„ E <br />JUN 12 1985 <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.