Laserfiche WebLink
EXHIBIT 1 <br /> INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br /> 12TH STREET WATER MAIM REPLACEMENT BETWEEN 20T'-' AVENUE AND OLD <br /> DIME HIGHWAY <br /> GENERAL V� <br /> I <br /> It is our understanding that the Indian River County Department of Utility Services (IRCDUS) is replacing <br /> the existing ACP water main located in the portion of the 121x' Street Right-of-Way between Old Dixie <br /> Highway and 20i3' Avenue. Due to the age of the facilities, the existing ACP water main has recently <br /> experienced several leaks in this section of line and has required several repairs. It is also our understanding <br /> that in an effort to remove rear lot located water meters and galvanized water mains,the project will replace <br /> the existing water Iines and residential stub outs for the residential neighborhood bounded by 14th Street to <br /> the north, 12th Street to the south, 16th Avenue to the west and 12th Avenue to the east. To address these <br /> concerns, we understand that the Department of Utility Services is proposing to abandon the existing ACP <br /> water main and replace with a new 8" PVC line in the 12"' Street Right-of Way from the 12'x' Street/20`x' <br /> Avenue intersection to the 12'x' Street/ Old Dixie Highway intersection. Furthermore, we understand the <br /> aforementioned residential neighborhoods will have new water mains and residential connections installed <br /> as part of this project. <br /> The proposed design improvements will consist of abandonment in place of the existing ACP and <br /> galvanized water mains. New fire hydrants will be installed where required pursuant to code requirements <br /> and residential connections to the new mains will be re-established. <br /> As such, MBV Engineering will provide the surveying, design, permitting, bidding assistance and <br /> construction services related to the above activities. <br /> SCOPE OF WORK <br /> The scope of work has been detailed below and represents the services provided for each of the Customer <br /> Convenience locations described above. <br /> TASK 1 —SURVEY(EXISTING CONDITIONS) <br /> CONSULTANT will obtain the boundary and topographic survey for the area to receive the improvements. <br /> In addition, the CONSULTANT shall locate all visible aboveground utilities, structures and buildings <br /> within the improvement area. Furthermore, CONSULTANT will obtain the drainage pipes, pipe inverts, <br /> existing swales and existing fences within the improvement areas as described below: <br /> ii <br /> 1. Delineate existing right of way lines and/or easements within project limits. <br /> 2. Show baseline stationing every 100 feet, set control points at a maximum of 500 foot <br /> separation and at any curve or change in direction, with benchmark data at a maximum of <br /> 500 foot separation. All elevations will be in NAVD88,all horizontal control will be in State Plane <br /> coordinates NAD83. <br /> 3. Depict right of way line along entire project as defined by engineer. <br /> 4. Locate pavement/dirt roads at a maximum of 100 foot stations. <br /> 5. Show elevations extending 10 feet beyond right of way lines at corresponding stations with road. <br /> 6. Contact Sunshine One for utility locations and depict paint markings and flagged underground <br /> utilities. <br /> Page 1 of 5 <br />