My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/11/1985
CBCC
>
Meetings
>
1980's
>
1985
>
9/11/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:51:31 AM
Creation date
6/12/2015 11:06:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/11/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 111985 BOOK L_2! PAGE 4-2 <br />at a county level and a local maintenance engineer level. He <br />noted they are in the process of some reorganization of personnel <br />structure, and when this is done can schedule a workshop meeting, <br />hopefully within 60 days or less. <br />ON MOTION by Commissioner Scurlock, SECONDED <br />by Commissioner Bowman, the Board unanimously <br />authorized the Public Works Director to work <br />with the D.O.T. to come up with a proper mix <br />on this maintenance schedule for at least our <br />major access points into the community and then <br />bring that back to the Commission so we can see <br />where the money is going to come from and how we <br />accomplish this. <br />Representative Patchett emphasized that he needs to know <br />what the monies involved are as their budgetary process starts in <br />January. <br />Director Davis believed many Commissioners have received <br />calls on the Rockridge outfall. He noted there has been some <br />money appropriated in the D.O.T. 5 year plan for some work on <br />that outfall, but looking at the dollars appropriated, he was not <br />sure what could be accomplished with that money. We have done a <br />lot of work on their local state system, and he would like to <br />maximize use of the money appropriated in the D.O.T. plan to work <br />with that outfall, which he believed is the number one mainte- <br />nance complaint we have in the D.O.T. system. He stated that he <br />would like to solve that problem as a capital improvement, not as <br />continual maintenance. <br />Terry Goff, Mayor of the City of Vero Beach, spoke of his <br />feeling that revival of the twin pairs project would solve some <br />City traffic problems. He was glad to see representatives of the <br />48 <br />1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.