Laserfiche WebLink
ATTACHMENT A <br />GRANT WORK PLAN <br />Project Title: Indian River County Hurricane Repair Project. <br />Project Location: Indian River County between DEPARTMENT Reference Monuments R20 and R55. <br />Project Background: This PROJECT consist of the restoration and maintenance of approximately 6.6 miles of <br />critically eroded shoreline between DEPARTMENT Reference Monuments R20 and R55 in accordance with <br />DEPARTMENT permit number 0285993 -001 -JC and subsequent modifications. The Sector 3 Beach and Dune <br />Restoration Project was constructed in three (3) separate phases from 2010-2012, placing approximately 550,000 <br />cubic yards of sand in the PROJECT area. In October of 2012, the PROJECT was impacted by Hurricane Sandy. <br />Emergency dune nourishment was conducted jointly under authority granted under the DEPARTMENT <br />Emergency Final Order — OGC No. 12-1641. The repair PROJECT was constructed in 2014. <br />The PROJECT shall be conducted in accordance with the terms and conditions set forth under this Agreement, all <br />applicable DEPARTMENT permits and the eligible PROJECT task items established below. All data collection <br />and processing, and the resulting product deliverables, shall comply with the standards technical specifications <br />contained in the DEPARTMENT'S Monitoring Standards for Beach Erosion Control Projects (2014) and <br />Processing Plan and Geographic Information System Guidelines, unless otherwise specified in the approved Scope <br />of Work (herein after referred to as SOW) for an eligible PROJECT item. This plan may be found <br />at http://www.dep.state.fl.us/beaches/publications/pdf/PhysicalMonitoringStandards.pdf One (1) electronic copy <br />of all written reports developed under this Agreement shall be forwarded to the DEPARTMENT, unless otherwise <br />specified. <br />The DEPARTMENT and the LOCAL SPONSOR agree that the estimated costs of the PROJECT are identified in <br />Table 1 below: <br />TABLE 1 <br />Estimated Eligible Project Cost <br />Task # <br />Eligible Project Tasks <br />State <br />Cost <br />Share <br />(%) <br />Federal <br />Estimated <br />Project <br />Costs <br />DEP <br />Local <br />Total <br />2.0 <br />Design and Permitting <br />2.1 <br />Design of Dune Repairs <br />50% <br />$38,739.00 <br />$38,739.00 <br />a <br />$77,478.00 <br />Subtotal <br />$38,739.00 <br />$38,739.00 <br />$77,478.00 <br />3.0 <br />Construction <br />3.1 <br />Emergency Dune Nourishment - <br />Orchid Beach <br />° <br />50% <br />$135,196.50 <br />$135,196.50 <br />a <br />$270,393.00 <br />3.2 <br />Emergency DuneNourishment - <br />Wabasso and Golden Sand <br />50% o <br />$37,575.50 <br />$37,575.50 <br />9 <br />$75,151.00 <br />3.3 <br />Hurricane Repair Construction <br />50% <br />$2,309,090.00 <br />$2,309,090.00 <br />$4,618,180.00 <br />Subtotal <br />$2,481,862.00 <br />$2,481,862.00 <br />$4,963,724.00 <br />4.0 <br />Monitoring <br />4.1 <br />2015 Biological Monitoring <br />50% <br />$145,055.50 <br />$145,055.50" <br />$290,111.00 <br />4.2 <br />2015 Physical Monitoring <br />50% <br />$34,343.50 <br />$34,343.50' <br />$68,687.00 <br />Subtotal <br />$179,399.00 <br />$179,399.00 <br />$358,798.00 <br />TOTAL PROJECT COSTS <br />$2,700,000.00 <br />$2,700,000.00 <br />$5,400,000.00 <br />DEP Agreement No. 14IR2, Amendment No. 2, Attachment A, Page 1 of 6 <br />